Oglethorpe County · Ordenanza de zonificación
Article XI - Project Design and Construction Standards / 1112 - Deceleration lanes and turn lanes.
Section 1112.05. Deceleration and turn lane construction standards.
Sobre este texto
- As posted on the county's website, retrieved 2026-11-23
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Deceleration and turn lanes shall meet the following standards:
a) A minimum 150 foot long lane with 50 foot taper and a minimum 25 foot taper on the acceleration side.
b) The length of the deceleration lane, (and acceleration side taper), shall be measured from the radius return point.
c) The width of the lane shall be no less than 24 feet from the centerline of existing two lane road to outside edge of new asphalt (26 feet to back of new curb).
d) Curb and gutter along all deceleration lanes and tapers are required, unless otherwise waived or modified by the County Engineer due to site, drainage or continuity considerations.
e) Associated drainage improvements as deemed necessary by the construction of the deceleration or turn lane shall be required.
f) Other project access improvements may be required by the County Engineer in addition to or in lieu of a required deceleration lane in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public, based on a traffic study prepared by a professional engineer.
g) The developer will pay the cost of any catch basins that must be constructed along an existing County road as a result of the deceleration lane.
h) Utilities and drain pipes shall be relocated at the developer’s expense outside of the deceleration lane.
Leer este código donde se publica (county website (oglethorpecountyga.gov)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.