Article XI - Project Design and Construction Standards

Section 1117.01. Responsibility during construction.

Sobre este texto

  • As posted on the county's website, retrieved 2026-11-23

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a) The developer and his/her Design Professional of Record have full responsibility for quality control and inspection during construction to ensure substantial conformance with the approved construction plans, County standards, County regulations, and generally accepted construction practices. County personnel are only providing construction observation to intermittently check the adequacy of the developer’s quality control and inspection.

b) Any construction issues requiring an interpretation and/or change in the plans, standards, and/or regulations are to be resolved by the Design Professional of Record and presented to the County Engineer for written concurrence or approval. Any design changes must be revised on the construction plans and issued as a change to the approved construction plans.

c) Failure of the developer to provide adequate quality control and inspection which results in a substantial nonconformance with the plans, standards, regulations or generally accept construction practice or endanger the public health, safety, and welfare shall be cause for the County Engineer or Code Enforcement Director to issue a Stop Work Order for any or all portion(s) of the construction in accordance with County procedures and ordinances. The order will remain in effect until the developer or his/her Design Professional of Record can demonstrate to the County that adequate quality control and inspection will be provided to address and correct the nonconformance and minimize the potential for further non‐conformance issues or endangerment issues.

d) Each day of continued construction on the scope of work covered by the Stop Work Order under this Development Code shall be considered a separate violation.

e) The developer controls the means, sequence, and methods of construction. As such, the developer has full responsibility for safety on the project site and compliance with all federal, state, and local regulations pertaining to safety and environmental requirements.

f) Preconstruction activity. Following the issuance of any permit authorizing clearing and grading of a site, areas required to be undisturbed, such as natural landscape buffers or stream buffers, must be designated by survey stakes, flags, ribbon, or other appropriate markings and shall be inspected and approved by the Code Enforcement Department Inspector prior to the commencement of any clearing or grading activities.

g) Grading.

1) Grading shall be done in accordance with the lines and grades drawn on the approved grading plan.

2) Required erosion and sedimentation control measures and stormwater drainage facilities are to be installed in accordance with the approved plans as development progresses.

Leer este código donde se publica (county website (oglethorpecountyga.gov)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:oglethorpe-county/zoning/1117.01@2026-11-23-a893c3b87b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Oglethorpe County Zoning Ordinance, Section 1117.01. Responsibility during construction | Georgia Commons