Oglethorpe County · Ordenanza de zonificación
Article VI - Environmental Protection Provisions / 604 - Groundwater Recharge Area Protection District
Section 604.06. Groundwater Protection Criteria
Sobre este texto
- As posted on the county's website, retrieved 2026-11-23
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a) No construction may proceed on a building or mobile home to be served by a septic tank unless the Oglethorpe County Health Department first approves the proposed septic tank installations as, at minimum, meeting the requirements of the Georgia Department of Human Resource for On‐Site Sewage Management (hereinafter DHR Manual), and Paragraphs b) and c), below.
b) The minimum lot size requirements for new homes served by a septic tank/drain field system in the Groundwater Recharge Area Protection District shall be the greater of either: 1) the minimum lot size requirements as specified in existing applicable County Ordinances, or 2) the minimum size limitations based on application of Table MT‐1 of the DHR Manual (hereinafter DHR Table MT‐1) as delineated in paragraphs 1), 2), and 3), below. The minimums set forth in Table MT‐1 may be increased further based on consideration of other factors (set forth in Sections A‐F) of the DHR Manual. The more restrictive lot size requirements or higher standards shall apply.
1) 150% of the subdivision minimum lot size calculated based on application of DHR Table MT‐1 if they are within a high pollution susceptibility area;
2) 125% of the subdivision minimum lot size calculated based on application of DHR Table MT‐1 if they are within a medium pollution susceptibility area;
3) 110% of the subdivision minimum lot size calculated based on application of DHR Table MT‐1 if they are within a low pollution susceptibility area.
c) The minimum lot size requirements for new mobile home parks served by septic tank/drainfield systems in the Groundwater Recharge Area Protection District shall be the greater of either: 1) the minimum lot size requirements as specified in existing applicable Oglethorpe County Ordinances, or 2) the minimum size limitations based on application of Table MT‐2 of the DHR Manual (hereinafter DHR Table MT‐2) as delineated in paragraphs 1), 2), and3), below. The minimums set forth in Table MT‐2 may be increased further based on consideration of other factors (set forth in Sections A‐F) of the DHR Manual. The more restrictive lot size requirements or higher standards shall apply.
1) 150% of the subdivision minimum lot or space size calculated based on application of DHR Table MT‐2 if they are within a high pollution susceptibility area;
2) 125% of the subdivision minimum lot or space size calculated based on application of DHR Table MT‐2 if they are within a medium pollution susceptibility area;
3) 110% of the subdivision minimum lot or space size calculated based on application of DHR Table MT‐2 if they are within a low pollution susceptibility area.
d) Land disposal of hazardous waste shall be prohibited.
e) New waste disposal facilities shall be prohibited.
f) New agricultural waste impoundment facilities shall be prohibited.
g) New aboveground chemical or petroleum storage tanks, having a minimum volume of 660 gallons, shall have secondary containment for 110% of the volume of such tanks or 110% of the volume of the largest tank in a cluster of tanks. Such tanks used for agricultural purposes are exempt, provided they comply with all federal requirements.
h) New facilities that handle hazardous materials of the types listed in section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and in amounts of 10,000 pounds or more on any one day, shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements and local fire code requirements.
i) Permanent storm water infiltration basins shall not be constructed in areas having high pollution susceptibility.
Leer este código donde se publica (county website (oglethorpecountyga.gov)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.