Peachtree City · Ordenanza de zonificación
Appendix B - LAND DEVELOPMENT ORDINANCE / Article VII - GENERAL DEVELOPMENT STANDARDS AND DESIGN GUIDELINES / Division 5 - STANDARDS FOR LIGHTING DESIGN
Sec. 732. Electrical streetlighting.
Sobre este texto
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Electrical streetlighting shall be installed in all subdivisions.
(b) Adequate streetlighting shall be determined and approved by the city planner during the approval of a preliminary plat. One copy of the approved streetlighting plan shall be forwarded to the electrical utility company servicing the subdivision.
(c) The developer shall provide adequate lighting at street intersections, and dead-end streets including culs-de-sac, and all at-grade cart paths crossing with collectors or arterial.
(d) As a minimum, luminaires are to be mounted at least 16 feet above grade. As a maximum, luminaires are to be mounted not more than 28 feet above grade. Adjustment in spacing and luminaire height may be made due to street curves, topography and natural foliage and type of equipment. A design within the range of the minimum and maximum shall be considered for approval that produces the effective horizontal illumination of 0.2 footcandle.
(e) Poles, fixtures and all related materials must be available standard stock items through the electric utility company servicing the subdivision or must be approved by the city planner.
(f) The developer shall pay the cost of installing the streetlights to the city planner and forwarding it on to city clerk during or before final plat approval. The city clerk shall forward the payment to the utility.
(g) The city will accept monthly charges for street light units on public property after negotiation and contract with the utility company following satisfactory implementation of subsections (a) through (f) above.
Historia
(Ord. No. 884, 5-18-2006)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.