When required by the planning commission, multi-use paths shall be installed by the developer and shall comply to the following standards:
(a) The alignment of the path shall conform to the general plan for the area or as directed by the planning commission. The path shall be located a minimum of four feet from any property line except where located on an easement for access to a street or where unique topographical features warrant such location. Such locations must be noted on the preliminary plat.
(b) All new multi-use paths shall be constructed at a minimum of ten feet in width, and shall be constructed of two-inch 9.5 mm Superpave asphalt over a four-inch compacted, aggregate base. The aggregate base shall extend a minimum of 36 inches on either side of the multi-use path. A clearance zone measuring four feet in width × eight feet four inches in height shall be provided and maintained as measured from the edge of the path. (A detail of these path standards is found within Local Design Manual.)
(c) Where existing ground conditions require cross drainage under paths, the pipe size and alignment of the culverts shall be directed by the city engineer.
(d) After the paving is complete, the paths shall be inspected by the city engineer and any defects noted and the developer so notified of the deficiencies. Grassing and backfilling the edges of the path shall be included within the specifications.
(e) Easements for multi-use paths shall be 20 feet in width as a minimum.
(f) In all new residential subdivisions where a multi-use path is located between two platted lots, a city-owned greenbelt of no less than 50 feet in width shall be provided and deeded to the city as a part of the final plat process. Clearing and grading within the greenbelt shall be kept to the absolute minimum necessary to accommodate construction of the path.
Historia
(Ord. No. 842, 12-2-2004; Ord. No. 969, § 1, 3-19-2009; Ord. No. 990, § 2, 12-17-2009; Ord. No. 1119, § 1, 12-1-2016)