Ir al contenido
Georgia Commons
Menú

Peachtree City · Ordenanza de zonificación

Appendix B - LAND DEVELOPMENT ORDINANCE / Article XII - TRAFFIC IMPACT

Sec. 1206. Evaluation and determination.

Sobre este texto

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Each required traffic impact study will be evaluated by the city as to its technical accuracy and its impact on the established minimum standard of traffic operations in the corridor. The cost of this evaluation shall be reimbursed to the city by the developer; and each evaluation shall produce a determination that a proposed project either complies with the established standard or it does not comply.

(a) If it is determined that a proposed project complies with the established minimum standard of traffic operations for all intersections in the corridor, a development permit shall be issued for the project, provided it meets all other applicable city codes and ordinances.

(b) If it is determined that a proposed project will not comply with the established minimum standard of traffic operations at one or more intersections in the corridor, the developer may:

(1) Reach an agreement with the city on a plan to mitigate the negative impact the project will have on traffic in the corridor; or

(2) Delay implementation of the project until the thoroughfare capacity is increased in accordance with the DOT plans; or

(3) Delay implementation until traffic is reduced in the corridor by other capital improvements to the point where the proposed project is able to comply with the established minimum standard of traffic operations within the corridor.

(c) If a developer reaches an agreement with the city on a plan to mitigate the negative impact of a project in accordance with (b)(1) above, a development permit shall be issued for the project, provided the mitigation plan is fully implemented as a part of the permitted work, and provided the project, including the mitigation plan, meets all other applicable city codes and ordinances.

(d) If a developer delays implementation of a project until the thoroughfare capacity is increased in accordance with (b)(2) above, a development permit shall be issued for the project upon completion of the DOT improvement work, provided the project meets all other applicable city codes and ordinances.

(e) If a developer delays implementation of a project in accordance with (b)(3) above, a development permit shall be issued for the project upon completion of other capital improvements that reduce traffic in the corridor to the point where the project is able to comply with the established minimum standard of traffic operations within the corridor, provided the project meets all other applicable city codes and ordinances, as well as all other portions of this article.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 724, 11-4-1999; Ord. No. 725, 11-4-1999)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:peachtree-city/zoning/appendix-b-article-xii-1206@2026-11-14-de28f2a378

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Peachtree City Zoning Ordinance, Sec. 1206 (Appendix B, Article XII). Evaluation and determination | Georgia Commons