Pooler · Ordenanza de zonificación
Appendix A - ZONING / Article III - GENERAL PROVISIONS
Section 16. Communication equipment.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(A) Structural plans for all commercial radio, television, cellular and other transmitting or relay antenna towers must be approved by an engineer licensed to practice in the State of Georgia and a permit issued by the building official.
(B) Only communication equipment located on public property may exceed 35 feet above the average natural grade.
(C) Communication towers must meet all front, rear, and side yard setbacks.
(D) All towers shall be designed and constructed to withstand a wind velocity of not less than 125 miles per hour.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.