Pooler · Ordenanza de zonificación
Appendix B - SUBDIVISIONS / Article VI - DESIGN STANDARDS
Sec. 606. Water supply and sanitary sewerage.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Water and sewerage facilities shall conform to the following requirements:
(606.01) Public water and public sewers. When feasible every portion of a subdivision shall be served by public water; when feasible, every portion of a subdivision shall be served by a [public] sanitary sewer system. All such systems shall be designed to preclude infiltration of floodwaters into the system and discharges from the system into floodwaters.
(606.02) Private water and private sewerage. Where either public water or public sewers or both are not available to a subdivision and a subdivider shall decide to establish a private water supply system and a private sewer system, then the plans and specification for such private water system and sewer shall be approved by the Chatham County Health Department and the aldermanic board. Any such private systems shall be so located as to avoid impairment of them, or contamination from them, during times of flooding.
(606.03) Publicly owned water and sewer systems. Water and sewer systems must be constructed in accordance with City of Pooler Standard Specifications; sewer systems must connect to an existing publicly owned treatment plant, where practical, and both water and sewer systems and trunk lines shall be conveyed to the City of Pooler for operation and maintenance.
Fire hydrants shall be a maximum of 300 feet apart in subdivisions zoned for multi-family, commercial or industrial use and a maximum of 500 feet apart in subdivisions zoned for single-family use.
Utilities.
1. All publicly owned utilities shall be installed in the road rights-of-way or approved access easements as defined in section 504.02.
2. Sanitary sewer, water mains, service laterals or other publicly owned utilities shall not be installed behind or between lots without the express approval of the City of Pooler. If allowed the utility will need to be in a proper easement.
3. Reserved.
4. The lift station shall have an access easement from the paved road in the subdivision.
5. The access easement to the lift station shall be a minimum width of 25 feet. The access easement shall have a road that is accessible during all weather conditions with a minimum width of 15 feet. The road shall be constructed to engineering approval and/or specifications. The City of Pooler reserves the right to have the access road mucked to the depth of the graded aggregate, if necessary.
Historia
(Ord. No. O2025-09.C, § V, 12-15-2025)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.