Pooler · Ordenanza de zonificación
Appendix A - ZONING / Article III - GENERAL PROVISIONS
Section 6. Schedule of development regulations.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Structure placement, lot size, number of structures, impervious surface, and building height vary by zoning district. Two tables are provided, on the pages to follow, that list these requirements by zoning district. An application for permit that cannot meet these requirements has two options. One is to apply for a variance and the other is to apply for a rezoning of the subject property to a zone with less restrictive requirements. These procedures are found in article V, administration and enforcement procedures.
(A) Schedule of residential district dimensional requirements.
Zoning District Minimum Lot Area (sq/ft) Units per acre Min. Lot Width at Building Line (ft) Max. Impervious Surface (Surface / Lot Size) Min. Yard Setback Distance (ft) Max. Height of Building (ft) Single Family Two-Family Multifamily front rear side R-1A 8,500 not permitted not permitted 60 60% 30 20 10 35 R-1B 22,000 not permitted not permitted 80 60% 40 30 20 35 R-1C 44,000 not permitted not permitted 125 60% 50 30 20 35 R-2A 7,500 11,250 not permitted 50 60% 30 20 10 35 R-2B 10,000 15,000 not permitted 60 60% 30 20 10 35 R-2C 5,000 7,500 not permitted 50 60% 25 20 20* 35 R-A 44,000 Not permitted not permitted 150 60%**** 30 10 10 35 RA-1 44,000 Not permitted not permitted 150 60%**** 30 10 10 35 RA-2 44,000 Not permitted not permitted 150 60%**** 30 10 10 35 R-3A 10,500 15,000 12 none 60% 40 20 20 50 R-3B 10,500 15,000 16 none 60% 40 20 20 50 R-3C 10,500 15,000 20 none 60% 40 20 20 50 R-4 See section 13.1 MH-1 10,500 not permitted not permitted 80 60% 30 20 10 20 MH-2A 6,000 not permitted not permitted 60 60% 35 20 10 20 MH-2B 44,000 not permitted not permitted 150 60% 50 30 30 20 MH-3 4,000*** not permitted not permitted none 60% 20 5** 5** 20 *At least 20 feet on one side with an allowable zero lot line on the other side.
**As long as there is at least 20 feet between each manufactured home.
***4,000 square feet refers to stand size. A minimum of five acres of land is required for a mobile home park in MH-3.
**** 60% max impervious surface for first 44,000 sq/ft, 8% max impervious surface on each acre hereafter.
(B) Schedule of commercial and industrial zoning district minimum yard requirements.
Schedule of minimum yard requirements Zone Front Yard* Rear Yard** Side Yard Height of Building C-1*** 40 10 10 45 C-2*** 60 10 10 60 C-P 30 20 20 50 1-1 60 20 20 70 1-2 80 40 40 70 *Corner and through lots must meet front yard setbacks on each side that fronts a street right-of-way.
**Through lots do not have a rear yard.
***In the C-1 and C-2 districts, corner and through lots are only required to have the required minimum front yard setback along a designated primary frontage. Other yards with road frontage shall be designated as secondary frontages or non-access frontages, where applicable. Secondary frontages shall include frontages that provide access to the site and non-access frontages shall be frontages that do not provide access to the site. For the C-1 district, secondary frontages shall have a minimum 25-foot setback and non-access frontages shall have a 15-foot setback. For the C-2 district, secondary frontages shall have a minimum 35-foot setback and non-access frontages shall have a 20-foot setback.
(C) Buildings above 35 feet. For a building height in excess of 35 feet, in no event shall a building permit be granted without the following restrictions:
(1) Structure beyond 35 feet in height shall have safe-guards consisting of fire escapes, sprinkler systems, smoke detectors and non-combustible materials and any other fire protection equipment deemed necessary at the time by the city council.
(2) Before a permit can be granted on said request, an affidavit of the builder and owner must be executed agreeing to same to be completed within an agreed upon reasonable time.
(3) Federal Aeronautics [Aviation] Administration (FAA) approval must be granted in certain areas of the city prior to requesting permission to construct structures above 35 feet. See city planner for distinction.
Historia
(Ord. No. 2021-08.B, § I, 9-20-2021; Ord. No. O2023-04.A, § I, 4-17-2023)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.