Appendix A - ZONING / Article V - PROCEDURES FOR ADMINISTRATION AND ENFORCEMENT
Section 1. Permits required for construction.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The following is a list of permits needed for construction of a building or structure or the movement of a building or structure that may be needed for any type of land development in the City of Pooler, Georgia.
(A) Building permit. A building permit issued by the administrative officer [building official] is required in advance of the initiation of construction, erection, moving or alteration of any building or structure. All applications for building permits shall be accompanied by a plat or plan in duplicate, drawn to scale, showing the actual dimensions of the lot to be built upon, the size of the building to be erected, the location of the building on the lot, the number of dwelling units the design is to accommodate, and such other information as may be essential for determining whether the provisions of this ordinance are being observed. A record of such application and plats or plans shall be kept by the administrative officer [building official]. A building permit is also required for swimming pools, fences, and lawn irrigation systems.
(B) Relocation permit. A relocation permit is required anytime a manufactured home, mobile home, trailer, out building, house or structure is moved from any location to any lot or parcel within the city limits of Pooler. Electrical, mechanical and plumbing permits are included within this permit. Buildings used for the purpose of storage only with no need for electricity or plumbing are exempt from this requirement.
(C) Sign permit. Prior to the erection of a sign for either on premises or off premises advertising, the building official must first issue a permit in accordance with the sign regulations set forth in the City of Pooler Sign Ordinance. Permits are required for both temporary signs as well as permanent signs.
(D) Demolition permit. Prior to destruction of a building, structure, or sign, a demolition permit is needed. Such permit may be attained from the City of Pooler Building and Zoning Department.
(E) Electrical permit. An electrical permit is needed before installing any electrical wiring or fixtures. This permit is not needed if a re-location permit or building permit has already been issued on the structure.
(F) Plumbing permit. A plumbing permit is needed whenever a plumber installs a new plumbing system in an existing structure. This permit is not needed if a re-location permit or building permit has already been issued on the structure.
(G) Mechanical permit. A mechanical permit is needed before a licensed installer may install any mechanical device such as a heating and/or cooling system for air or water. This permit is not needed if a re-location permit or building permit has already been issued on the structure.
(H) Subdivision of land. Whenever a lot, parcel, or tract of land is divided into two or more parts, the owner must submit a preliminary subdivision plat to the building official. The preliminary plat shall be reviewed at a public meeting held by the planning commission and then by the city council at a public hearing to follow. Once the preliminary plat is approved by city council, required infrastructure improvements may be permitted on the property. After the required infrastructure improvements are completed and inspected by the building inspector [official], a final plat may be submitted to the building official. The final plat shall be reviewed at a public meeting held by the planning commission and then by the city council at a public hearing to follow. Once the final plat is approved by the city council, all parcels created by the subdivision may be recorded in the Office of the Superior Court of Chatham County and subsequently become real estate. Subdivisions of three lots or less may be considered a minor subdivision where the preliminary and final plat procedure are combined into one. However, subdivisions of four lots and more or any division where infrastructure improvements are required will be considered as major subdivisions and must endure the complete process.