Section 2.2. Certificates of Occupancy.

Sobre este texto

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

It shall be unlawful to use or permit the use of land, building, or structure for which a building permit is required, and to use or permit to be used, any building or structure hereafter altered, extended, erected, repaired, or moved, until the Pulaski County Building Inspector has issued a Certificate of Occupancy stating that the provisions of these Regulations have been complied with.

The Certificate of Occupancy as required for new construction of, or renovations to existing buildings and structures, in the Building Code, shall also constitute Certificates of Occupancy as required by these Regulations.

Temporary Certificates of Occupancy may be issued for a part of a building or structure prior to the occupancy of the entire building or structure, provided that such Temporary Certificate of Occupancy shall not remain in force more than six (6) months, nor more than five (5) days after the building or structure is fully completed and ready for occupancy and, provided further, that such portions of the buildings or structure are in conformity with the provisions of these Regulations.

A record of all Certificates of Occupancy shall be kept in the office of the Zoning Administrator and copies of such Certificates of Occupancy shall be furnished upon request to a person or persons having a proprietary or tenancy interest in the property involved.

Accessory buildings or structures to dwellings shall not require a Certificate of Occupancy, but rather may be included in the Certificate of Occupancy for the principal dwelling, building, or structure on the same lot when such accessory buildings or structures are completed at the same time as the principal use.

Certificates of Occupancy shall be applied for coincident with the application for a building permit and shall be issued within ten (10) days after the erection or alteration of such building has been completed in conformity with the provisions and requirements of these Regulations. If such Certificate is refused for cause, the applicant therefore shall be notified of such refusal and the cause thereof within ten (10) days.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:pulaski-county/zoning/2.2@2023-06-05-6d95ec730d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Pulaski County Zoning Ordinance, Section 2.2. Certificates of Occupancy | Georgia Commons