Pulaski County · Ordenanza de zonificación
Appendix B - LAND DEVELOPMENT REGULATIONS / Chapter 5 - GENERAL PROVISIONS
Section 5.5.2. Permitting, Inspection, Certificate of Occupancy and Fees.
Sobre este texto
- As published by Municode, current through 2023-06-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A permit shall be required to locate a pre-owned manufactured home in the jurisdiction. All permits shall be issued within three (3) business days of receipt of all items listed in subsections (a)(1)—(4) of this Section.
(a) Permit. To obtain a permit, Applicants shall provide to the building inspector:
(1) An affidavit signed by the applicant that the pre-owned manufactured home meets health and safety standards required by this Act;
(2) Photographs of the interior and exterior of the pre-owned manufactured home providing evidence that home meets the minimum health and safety standards of Section 4 of this Ordinance, At the request of the Applicant, the building inspector may, at his or her discretion, inspect a pre-owned manufactured home prior to its being relocated if the home is then located at another site within the County;
(3) A refundable guarantee of condition bond or refundable cash deposit; and
(4) The permit and inspection fee required by subsection (d) of this Section.
(b) Inspection. Upon receipt of a permit, Applicants may relocate the manufactured home on a residential site for the purposes of inspection. Applicant shall arrange for an inspection to be held once the installation of the manufactured home is complete.
(c) Certificate of Occupancy. A certificate of occupancy shall be issued to the Applicant at such time that the building inspector certifies that the requirements of this Ordinance have been met.
(d) Fee. A permit and inspection fee shall be charged to the applicant to cover the cost to the County to process the permit application and inspect the pre-owned manufactured home. Such fee shall cover the initial inspection and one follow-up inspection. The applicant shall be charged an additional fee for each additional follow-up inspection that may be necessary.
(e) Setting of Bonds, Cash Deposits, and Fees: Bonds, Cash Deposits, and Fees for this section (Section 5.5.2) shall be set by the Pulaski County Commissioner during an official meeting of the Commissioner that has been advertised according to the Commissioner's open meetings policy.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.