Sec. 11.18. Basic construction requirements for all classes of streets.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
PAVING REQUIREMENTS.
(1) Clearing and Grubbing Right-of-Way. This work shall consist of removing and disposing of all vegetation and debris within the right-of-way to a depth of at least one (1) foot below finished subgrade. Topsoil shall be stripped and stock piled for later use. All stump holes shall be backfilled and compacted with suitable material, Class I or II soil.
(2) Subgrade. This work shall consist of placing, mixing, compacting and shaping the top six (6) inches of soil. This work also includes subgrade stabilization.
(a) Compaction. The entire surface shall be plowed, harrowed and mixed to a depth of at least 6". After the material has been thoroughly mixed, the subgrade shall be compacted at ninety-five (95) percent of the maximum density. Suitable rollers are required.
Compaction tests shall be made by a certified engineer or from a certified laboratory. Tests are to be made along the road bed at five hundred (500) foot intervals and at every two (2) feet of fill. Any areas that do not meet with the specified compaction, shall be excavated and replaced with suitable material.
Test results shall be submitted to the Taylor County Building Inspector as conducted. All costs for Compaction tests shall be incurred by the developer.
(b) Subgrade material. All streets shall consist of Class I or II soil. If such material is not available on site, it shall be furnished by the developer.
(3) Storm Drainage. An adequate drainage system based on a twenty-five (25) year rainfall frequency for cross drains and ten (10) year rainfall frequency for longitudinal drainage systems shall be provided. Pipe material shall be as follows:
Reinforced Concrete Pipe Bituminous Coated Corregated Metal Pipe High Density Polyethylene Pipe
(4) Installation of Utilities. After grading is completed and approved and before any base is applied, all of the underground utilities, including water mains, sewer mains, gas mains, and all service connections related thereto, shall be installed completely and approved throughout the length of the street and across the flat section. All driveways for houses to be built by the subdivider shall be cut and drained. Where the utility mains are off the pavement, the subdivider may elect to omit the installation of service connections providing that at such time as these service connections are needed, they shall be jacked across the street without breaking or weakening the existing pavement.
(5) Slopes and Shoulder Improvements. The minimum ratio for all fill or cut slopes shall be two (2) to one (1) and the minimum width for all shoulders from back edge of the curb, if installed, shall be eight (8) feet. All shoulders shall slope one-half (1 /2) inch to the foot.
(See Typical Section, Figure 1). When all construction is completed, all slopes and shoulders shall be cleared of all rubbish and shall have a stand of grass to prevent erosion, either by sprigging or seeding.