Appendix A - ZONING / Article VII - PROCEDURES FOR ADMINISTRATION AND ENFORCEMENT

Section 2. Permits or actions required by this ordinance.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The following are permits that may be required depending on the construction and particular land use district for which it will take place.

(A) Conditional use permits. There are specific land uses permitted in certain zoning districts only after a review by the planning commission, a public hearing has been held by planning commission, and the mayor and council has determined that the use is appropriate based on certain criteria. These uses are listed throughout article IV and the criteria are listed in section 4 of this article.

(B) Site development plan approval. All land development activities other than residential one and two family structures, regardless of the zoning district, must present a site development plan of such development to the zoning administrator and city engineer for review prior to the issuance of any land development permits. The sitedevelopment plan is also reviewed by the planning commission and forwarded to the mayor and council for approval once all comments are addressed, and after consideration of the criteria set forth at section 7 of this article.

(C) Zoning variance. Where strict enforcement of this ordinance may present an unnecessary hardship upon a lot or parcel of land, the owner may apply for a zoning variance.

(D) Amendment to the zoning map. An amendment to the zoning map is considered to be an amendment to the zoning ordinance. Such action requires a public hearing and approval by the mayor and council at a scheduled meeting after consideration of the criteria in section 7 of this article.

(E) Amendment to the text of this ordinance. An amendment to the text of the zoning ordinance follows the same process as an amendment to the zoning map. However, a text amendment requires different materials to be included with the application, to wit: The language of the proposed text amendment and a written explanation of what part or parts of this ordinance is proposed for amendment by such text.

(F) Planned development. A process whereby a large parcel of land or contiguous group of parcels may be divided into a combination of different zoning districts based upon a long term development plan. Approval of a planned development requires a public hearing and approval by the mayor and council at a scheduled meeting after

consideration of the criteria in section 11 of this article.

(G) Application for extension of time. An application for extension of time may be made where the provisions of this ordinance permit such. Such action requires a public hearing by the planning commission and approval by the mayor and council at a

scheduled meeting, after considering the criteria for such contained in section 7 of this article.

(H) Permits required in conjunction with permits in this ordinance. The following are permits required by other government entities that may be applicable to a development project in the city.

(1) Land disturbing activity permit. Under the Georgia Soil Erosion and Sedimentation Act (O.C.G.A. 12-7-7), any disturbance of land of over one and one-tenth of an acre requires a land disturbing permit from the city zoning administrator.

(2) Construction in wetlands. In conjunction with Georgia DNR, the United States Army Corps of Engineers maintains the authority to delineate the location of

wetlands and is responsible for permitting any land disturbing activity in them under Section 404 of the Federal Clean Water Act.

(3) Individual well systems. If an individual well system is required for any land development, a well permit is required from the county board of health.

(4) Individual sewer systems. If a lot or parcel is not served by city sewer utilities, a permit is required from the county board of health.

(5) Entrances on state and federal highways (curb cuts). If the development of a lot, tract, or parcel requires an entrance onto a state or federal highway, a permit is required by the Georgia Department of Transportation.

(6) Shallow wells for irrigation only. If a property owner decides to use a shallow well for the irrigation of his or her landscape, a well drilling permit must be obtained from the city zoning administrator and the pump installation and design must

meet the plumbing codes set forth by Southern Building Code Congress International and the laws of the state.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:richmond-hill/zoning/appendix-a-article-vii-2@2026-11-11-9f5efed226

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Richmond Hill Zoning Ordinance, Section 2 (Appendix A, Article VII). Permits or actions required by this ordinance | Georgia Commons