Ir al contenido
Georgia Commons
Menú

Ringgold · Ordenanza de zonificación

Appendix C - SIGNS / Article VII - ADMINISTRATION AND ENFORCEMENT

7.2. Permit fee.

Sobre este texto

  • As published by Municode, current through 2025-03-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

7.2-1 A permit fee shall be paid to the zoning administrator for each permit required by this ordinance. The fee shall be in accordance to rate schedule maintained in the office of the city manager. No permit shall be issued until the exact dimensions and area of the sign have been filed with the zoning administrator.

7.2-2 Permit fees shall not apply to the ordinary servicing, repainting of existing sign message, cleaning of a sign, nor to changing of advertising on a sign specifically designed for periodic change of message without change in structure.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:ringgold/zoning/appendix-c-article-vii-7.2@2025-03-10-e27e12b21f

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Ringgold Zoning Ordinance, 7.2 (Appendix C, Article VII). Permit fee | Georgia Commons