Rockdale County · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Part B - PLANNING AND DEVELOPMENT / Title 3 - DEVELOPMENT AND PERMITTING / Chapter 302 - SUBDIVISION AND SITE DEVELOPMENT STANDARDS / Article V - DEVELOPMENT PERMITS

Sec. 302-52. Moved-in house.

Sobre este texto

  • As published by Municode, current through 2026-01-27
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Moved-in houses shall require a special use permit in all residential districts, and shall be subject to approval at a public hearing by the Rockdale County Planning and Zoning Commission and the board of commissioners of Rockdale County.

(a) Inspections.

(1) Preliminary inspection. No building permit or application for a conditional use for a moved-in house shall be approved until a complete inspection of the structure is made by the department. An application for

moved-in house inspection shall be completed on forms provided by the department prior to the inspection being made. The department inspection shall determine the compliance or the feasibility of compliance to all

existing development codes and ordinances adopted by the Rockdale County Board of Commissioners. Depending upon the size, age, condition, or design of the structure; the director may require an inspection

and report from a structural engineer to evaluate the suitability of the structure for moving. The engineering inspection and report shall be paid by the applicant for the

moved-in house.

(2) Inspection fee. The applicable inspection fee shall be paid to the department prior to the inspection being made.

(3) Performance bond required of owner of structure. To ensure that the structure will meet all of Rockdale County's building construction codes and that

the renovation of the move-in structure is completed and ready for occupancy within six months from the date the building permit is issued,

the owner of the move-in structure shall provide a $10,000.00 performance bond or bank escrow letter of surety from a bank approved by

Rockdale County, made payable to the Rockdale County Board of Commissioners.

(b) Building permit. A building permit shall be obtained from the building department for a moved-in house.

(c) Owner certification. All applications for a move-in permit shall be accompanied by a sworn affidavit that said applicant is the owner of the move-in structure and said owner shall obtain a certificate of occupancy to verify completion of all work, and that the structure is ready for habitation.

(d) Route approval.

(1) Structures that will be placed in Rockdale County. Prior to the issuance of a permit for a move-in structure, the applicant must first submit and receive approval from the Rockdale County Sheriff's Department regarding the proposed route.

The applicant shall provide information concerning the name and address of the moving company; owner of the structure to be moved; destination of the structure;

type and size of structure; map of the proposed route; and insurance company.

Said approval and information must be on forms furnished by the department and shall be submitted to the department.

Routes must comply with chapter 110 of the Rockdale County Code of Ordinances.

Structures to be moved shall not exceed 30 feet in width.

(2) Structures not to be located in Rockdale County. Prior to moving a pre-existing structure through Rockdale County, routes must be established by the Rockdale County Sheriff's Department on forms provided by the department. The applicant shall provide information concerning the name and address of the moving company; owner of the structure to be moved;

destination of the structure; type and size of the structure; map of the proposed route; and insurance company. Structures to be moved shall not exceed 30 feet in width. Required police escort must be pre-arranged with the Rockdale County Sheriff's Department three days prior to moving the structure from Rockdale County. Move-through structures will be allowed only on state routes.

(e) Bonds required of moving companies.

(1) Personal injury and property damage insurance bond. Any firm or individual moving structures into, or through, Rockdale County shall be required to retain insurance with a minimum $25,000.00 for property damage and $300,000.00 for personal injury. A copy of the insurance bond shall

be provided to the department.

(2) Performance bond. A performance bond or surety bond in the amount of $10,000.00 must be maintained by the moving company to enable Rockdale County to repair public and private property in the event

that the moving company's insurance company fails to pay for necessary repairs.

(f) Guarantee of completion. No application for a building permit shall be approved until a performance bond or irrevocable bank escrow letter of surety shall first be posted with the Rockdale

County Board of Commissioners in the amount of $10,000.00 as referred to in subsection (e) above.

(g) Time of completion. All permits for move-in structures must be completed and in compliance with all codes and ordinances of Rockdale County within six months from the date of granting of the building permit. In the event said structure is not in compliance and/or is not completed within the specified time limit, the director shall notify, in writing, the surety bonding company giving specific causes of noncompliance or completion.

Upon notification, the surety bonding company has 30 days to correct said causes of noncompliance or non-completion. In the event of failure of the surety bonding company to correct

causes of non-compliance or non-completion, said bond shall be forfeited and a notice to move said structure shall be issued to the owner immediately. Failure to move or demolish said structure within ten days of this notice shall be deemed a

violation of this section and shall be punishable in the small claims court or magistrates court of Rockdale County.

(h) Certification of occupancy. A certificate of occupancy shall be issued upon final inspection of a structure and shall verify the completion requirements hereinabove set forth.

(i) Extension of completion time. The director may issue one extension of completion time for cause, not to exceed 30 days beyond the original six-month compliance/completion period. An extension of compliance/completion time shall be in writing and signed by the director designating the

reasons for granting the extension request. Permission for a greater extension of time may be granted only by the board of commissioners sitting in regular public session.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 0-2006-32, §§ 1-3, 11-28-2006)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:rockdale-county/zoning/302-52@2026-01-27-f2e6b4fe4f