Ir al contenido
Georgia Commons
Menú

Rome · Ordenanza de zonificación

Appendix B - UNIFIED LAND DEVELOPMENT CODE / Article 2 - PROCEDURES

2.3.2. Procedure for project approval.

Sobre este texto

  • As published by Municode, current through 2026-01-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a. An application for project approval may be processed independently or in conjunction with an application for issuance of a development permit.

b. The property owner or their authorized representative shall submit an application for project approval to the Building Inspection Department. The application

shall include:

(1) A properly completed application form, as furnished by the Building Inspection Department, requesting review for project approval.

(2) Copies of the site plan showing the entire ownership drawn to the specifications of this Section, in a number as required by the Building Inspection Department.

(3) Payment of all applicable application and review fees, as established by the Governing Body from time to

time.

c. The Building Inspection Department shall review the application for completeness at the time of submission. Incomplete applications will be returned to the applicant.

d. Within two weeks following receipt of the application, the Building Inspection Department shall return to the applicant, on the drawing or in writing, all comments related to compliance with this Development Code.

e. The owner shall be responsible for compliance with all codes, regulations and zoning requirements and for the satisfaction of

all the noted and written comments.

f. The Building Inspection Department may not approve any site plan whereon is shown a lot or situation that would clearly require a variance to order to be reasonably usable, whether due to the presence of flood plain, unusual configuration,

zoning compliance, lack of public utilities, or for any other reason.

g. When the Building Inspection Department has determined that the site plan is in compliance with the requirements,

purpose and intent of this Development Code, it shall be approved. The Chief Building Official or his designee shall sign and date the Certificate of Project Approval stamped or printed on a reproducible copy of the site plan. One copy of the approved drawing shall be transmitted to the applicant and one copy shall be retained by the Building Inspection Department.

h. The Certificate of Project Approval shall remain in effect for a period of six consecutive months after which time it shall become null and void and a new Certificate

may be required if either no permit has been issued or a permit has been issued but no development activity has begun.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:rome/zoning/2.3.2@2026-01-26-231ed7edec

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Rome Zoning Ordinance, 2.3.2. Procedure for project approval | Georgia Commons