Rome · Ordenanza de zonificación
Appendix B - UNIFIED LAND DEVELOPMENT CODE / Article 2 - PROCEDURES
2.9.1. Building permit required.
Sobre este texto
- As published by Municode, current through 2026-01-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a. Building permits for all structures or interior finishes are issued after meeting the applicable requirements of the fire
prevention and life safety code and the various health and building codes. A permit is also required for the movement of any site-built house, structure or building.
b. For any structure served by an on-site sewage disposal system, a permit issued by the Floyd County Health Department shall be required prior to issuance of a Building permit. Said permit may first require approval by the Floyd County Health Department of a plan showing the location of the sewage disposal system and other on-site improvements, in accordance with their regulations.
c. Building permits shall only be issued on lots of record, as defined in this Development Code.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.