2.9.3. Construction in flood area. Construction

Sobre este texto

  • As published by Municode, current through 2026-01-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

of a building for which a flood area permit was issued shall be governed by the following:

a. Upon placement of the lowest floor, or flood proofing by whatever construction means, or upon placement of the horizontal structural members of the lowest floor, whichever is applicable, it shall be the

duty of the development permit holder to submit to the Chief Building Inspector a certification of the elevation of the lowest floor, flood proofed elevation, or the elevation of the lowest portion of the horizontal structural members of the lowest floor,

whichever is applicable, as built, in relation to mean sea level.

b. Certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer

and certified by such registered land surveyor or professional engineer. When flood proofing is utilized for a particular building, the certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by the professional engineer or architect.

c. Any work undertaken prior to submission of the certification shall be at the development permit holder's risk.

d. The Chief Building Inspector shall review the floor elevation survey data submitted.

The development permit holder immediately and prior to further progressive work being permitted to proceed shall correct

deficiencies detected by such review. Failure to submit the survey or failure to make the corrections shall be cause to

issue a stop-work order for the project.

(Ord. No. 01-7-2, § I, 7-16-01)

2.10. Text amendments.

The Rome-Floyd County Development Code may be amended from time to time in whole or in part under the provisions of this section. For an amendment having application in both the City and County to become effective, the governing bodies of both the City and the County must approve it. For an amendment having on its face application only in the City to become effective, the Governing Body of the City only must approve it. For an amendment having on its face application only in the county to become effective, the governing body of the County only must approve

it.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:rome/zoning/2.9.3@2026-01-26-2241f3813a

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Rome Zoning Ordinance, 2.9.3. Construction in flood area. Construction | Georgia Commons