Ir al contenido
Georgia Commons
Menú

Senoia · Ordenanza de zonificación

Chapter 74 - ZONING TABLE OF CONTENTS / Article IX - (A). COMMERCIAL CORRIDOR OVERLAY

Sec. 74-194. Loading areas.

Sobre este texto

  • As published by Municode, current through 2025-12-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Loading docks and loading areas shall be located or screened so as to be concealed from view from neighboring streets and properties. No loading dock shall be located between the primary or secondary facade of any building and a public street.

(b) All loading docks shall be screened from view of any street or residentially zoned lot by a continuous planting of evergreen shrubs. Shrubs shall be moderately growing, be a minimum height of six feet at time of planting, and reach a height of eight feet within two years of planting.

(c) Commercial properties that adjoin a residential zoning lot to the rear shall enclose loading areas using a masonry wall constructed of materials and exterior finishes identical to the side elevations and having a minimum height of six feet and a maximum height of ten feet.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 07-05, Art. 9, 12-3-2007)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:senoia/zoning/74-194@2025-12-10-ee31301bc6

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Senoia Zoning Ordinance, Sec. 74-194. Loading areas | Georgia Commons