Ir al contenido
Georgia Commons
Menú

Senoia · Ordenanza de zonificación

Chapter 74 - ZONING TABLE OF CONTENTS / Article IX - (A). COMMERCIAL CORRIDOR OVERLAY

Sec. 74-212.5. Plan review procedures.

Sobre este texto

  • As published by Municode, current through 2025-12-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Application procedures. All applicants for new development, and/or construction permits that expand the use or building footprint shall apply for plan approval through the community development director. Application forms, available from the city, must be submitted together with a scaled site plan depicting the proposed improvements.

Applications shall be filed with the community development director 30 days prior to the meeting of the planning commission shown on the City of Senoia website.

(b) Pre-application conference. Prior to filing an application for rezoning, development permits or building permits of property within the overlay, the applicant shall confer with the community development director for the purpose of reviewing the proposal and to obtain information about development standards and ordinances affecting property within the overlay.

(c) Application requirements. Any application for rezoning in the downtown corridor overlay shall be accompanied by a site plan and building design schematics as provided below. A narrative containing the following information shall also be provided:

• Applications for development under this article shall be accompanied by a scaled site plan of not greater than one inch equals 50 feet depicting lot size, project dimensions, pedestrian circulation; vehicular access and parking facilities; loading facilities, greenspace, landscaping and buffers, site lighting, dumpsters; and adjoining uses and zoning.

• Information concerning adjoining uses shall indicate the architectural relationship of the proposed project or improvement to the surrounding context and shall be in the form of sketches or photographs.

• A description of the character of the development, including a summary of floor area by use types, number, total lot area and square footage allocation for parking, landscaping and greenspace.

• A development and construction schedule indicating major milestones in the proposed development.

• Projects to be developed in phases shall provide a general statement of the proposed development schedule by phase.

• Any agreements, provisions and covenants that govern the use, maintenance and protection of the development and any common or greenspace areas.

• A professional traffic study may be required for projects expected to generate more than 500 vehicle trips per day.

• Development must comply with the City of Senoia Tree Protection Ordinance.

• A "design book" that will depict and guide architectural style, scale and materials to be used in the development shall also be produced by the applicant. The front, rear and side elevations and perspective drawings of all structures to be built must be included in the design book.

(d) Review procedures. The community development director and planning commission shall review all applications regulated under this article. Such review shall ensure proposal consistency with the purposes of this article and conformance to the standards contained herein. Site plan review by the community development director and planning commission shall precede any action by mayor and council. The findings and recommendations of the community development director and planning commission shall be provided to the mayor and council, which may incorporate such findings and recommendations in their consideration of the proposal. Planning commission shall be empowered to issue non-binding approvals or denials of site development, construction or alteration matters. All applications require final action by the mayor and council.

Applications that are approved by the mayor and council shall be forwarded to the community development director and the necessary permits issued. Should the applicant be unable or unwilling to comply with the recommended changes suggested to reach compliance with this article, no permits shall be issued. All recommended changes shall comply with the standards set out herein.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 21-16, § 2, 11-15-2021)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:senoia/zoning/74-212.5@2025-12-10-2d6f4d959e

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Senoia Zoning Ordinance, Sec. 74-212.5. Plan review procedures | Georgia Commons