Sky Valley · Ordenanza de zonificación
Appendix A - ZONING / Article XVIII - ADMINISTRATION, INTERPRETATION, ENFORCEMENT, PENALTIES AND REMEDIES
Sec. 1804. Building permit required.
Sobre este texto
- As published by Municode, current through 2024-04-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
No structure or sign, except as specifically exempted by these regulations, shall be erected, moved, extended, enlarged or structurally altered, nor shall any excavation or filling of any lot for the construction of any structure be commenced until the Building Inspector has issued a building permit for such work in conformity with the provisions of these regulations.
All building permits shall be issued by the Building Inspector. In cases of uncertainty regarding whether a proposed structure or structure conforms to any provisions within these regulations, the Building Inspector shall consult with the City Manager for his interpretation and ruling. Building permits shall become invalid unless the work authorized by it shall have been commenced within ninety
(90) days of its date of issue, or if the work authorized by it is suspended or abandoned for a period of three (3) months or more.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.