Smyrna · Ordenanza de zonificación
Appendix A - ZONING ORDINANCE / Article XIII - ADMINISTRATION, ENFORCEMENT, PENALTIES AND REMEDIES
Sec. 1306. Certificate of occupancy required.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A certificate of occupancy issued by the building inspector is required in advance of the use or occupancy of:
(a) Any lot or a change or extension in the use thereof.
(b) A building hereafter erected or a change in the use of an existing building.
(c) Nothing contained herein shall require a user to comply with minimum setback or
side yard requirements for use of an existing structure.
A certificate of occupancy, either for the whole or a part of a building, shall be applied for coincident with the application for a building permit and shall be issued within ten days after the erection or structural alterations of such building, or part thereof, shall have been completed in conformity with the provisions of this ordinance. A certificate of occupancy shall not be issued unless the lot, building or structure, or use thereof complies with all the provisions of this ordinance. If the certificate of occupancy is denied, the building inspector shall state in writing the reasons for refusal and the applicant shall be notified of the refusal. A record of all certificates shall be kept on file in the office of the building inspector and copies shall be furnished on request to any person having a proprietary or tenancy interest in the building or land involved.
Historia
(Mo. of 3-10-75; Ord. No. 2019-04, 2-18-19)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.