Springfield · Ordenanza de zonificación
Part II - CODE OF THE CITY OF SPRINGFIELD, GEORGIA / Part B - LAND DEVELOPMENT REGULATIONS / Chapter 118 - DEVELOPMENT REGULATIONS / Article III - [COMMERCIAL DEVELOPMENT]
Sec. 118-22. Final approval of site construction and dedication of infrastructure.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Approval. When site construction is completed final inspection by the city engineer is required. The property must be in compliance will all aspects of the approved site plan on file with the building and zoning department.
(b) As-builts and record drawings. After completion of the final inspection as-built drawings, or record drawings, shall be submitted to the City of Springfield. All infrastructure to be dedicated for public use, or leading into private property must be reflected in these documents.
(c) Dedications. Any roadways dedicated for public use, infrastructure extensions, or infrastructure resources to be dedicated to the City of Springfield shall be conveyed to the city with a deed or dedication or warranty bond. If bonding is required, a bond or letter of credit equivalent to ten percent
of the construction costs of the infrastructure to be dedicated must be provided prior to acceptance.
The city council will vote to approve the bond or letter of credit and accept the infrastructure a their next available council meeting.
Historia
(Ord. No. 2025-06, § 1 (Exh. A), 4-8-2025)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.