Stockbridge · Ordenanza de zonificación
Title 12 - UNIFIED DEVELOPMENT CODE / Chapter 8 - ADMINISTRATIVE PROCEDURES
8.2. Approval required.
Sobre este texto
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. No person shall conduct any development activity within the jurisdictional boundaries of the City of Stockbridge without first obtaining approval of a subdivision plat, development plan, construction plans, and permits to perform such activities.
B. Permits shall only be issued for development on platted and recorded lots.
1. No permits shall be issued on lots described only by metes and bounds.
2. All development activities or site work conducted after approval of a subdivision plat or development plan shall conform to the specifications of the approved plans.
C. Major changes to an approved plan, as defined below, shall require specific approval of an amended plan.
1. Altering the amount and velocity of stormwater runoff from the site;
2. Increasing the amount of impervious surface within the development;
3. Altering the overall density of development;
4. Substantially increasing the amount of excavation, fill, or removal of vegetation during construction; or
5. Otherwise altering the overall appearance of the development as proposed as determined by the director.
D. The following situations are exempt from the requirement to obtain an approved development plan prior to the issuance of required permits:
1. Repairs to a facility that is part of a previously approved and permitted development.
2. Accessory structures, provided applicable permits are obtained.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.