Suwanee · Ordenanza de zonificación
Article XVII - BUFFER, LANDSCAPE AND TREE PRESERVATION REQUIREMENTS / 1705 - Compliance. / 1705.3 - Inspection.
1705.3.3. Final Inspection
Sobre este texto
- As posted on the city's website, retrieved 2026-11-14
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Prior to the release of the project for final platting or Certificate of Occupancy, or other form of acceptance, the City Inspector shall inspect for compliance with all requirements.
NOTE: Procedures for final inspections may vary when consideration must be given to the peculiarities of a particular type of construction project. Any disturbances in Tree Save Areas or deficiencies in the required Site Density Factor will be cited at this time. Tree Save Area disturbances and/or SDF deficiencies must be corrected with new tree plantings prior to project release.
Existing trees which are not expected to survive will not be counted toward meeting density requirements. Conversely, any existing trees not shown to remain on plans but which have been preserved (meeting all tree preservation standards) through field adjustments may be counted toward density requirements, provided that all changes are accepted by the City Engineer.
New tree plantings may be postponed for up to nine (9) months by posting performance security. The project will not be released until after receipt of the security by City of Suwanee
Leer este código donde se publica (city website (downloaded by hand)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.