Ir al contenido
Georgia Commons
Menú

Suwanee · Ordenanza de zonificación

Article VIII - TELECOMMUNICATIONS ANTENNA AND TOWER REGULATIONS

SECTION 803. Tower Requirements

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-14

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Application: Contents; fee All applications for permission to construct new telecommunications towers shall be submitted to the City Administrator. Each application shall contain as a part thereof detailed plans and specifications as set forth in Section 804. An application shall not be accepted for processing without the information required in this Article.

An application fee shall be charged by the City in an amount stated in the schedule of fees and charges.

B. Exhibits Required Each applicant requesting permission to construct a new telecommunications tower under this Article shall submit a scaled site plan, scaled elevation view and supporting drawings, calculations, and other documentation, signed and sealed by appropriate licensed professionals, showing the location and dimensions of all improvements including topography (utilizing minimum two (2) foot contour intervals), tower height requirements, setbacks, access driveways or easements, parking, fencing, landscaping, adjacent land use, and any other information deemed by the City to be necessary to assess compliance with this Article and compatibility with surrounding uses.

C. Co-location of Antennas Required Applicants for the erection of a tower or antenna, except amateur radio operations, shall be required to be co-located upon an existing tower structure. An exception to co-location shall only be made if the applicant adequately demonstrates that an existing tower suitable for co-location does not exist in the geographic placement area utilizing the tower inventory maintained by the City, and that no suitable alternative tower structure is available as set forth in Section 806 contained herein.

D. Considerations For Reviewing New Telecommunication Towers Any denial of a request to place, construct or modify a telecommunications facility shall be in writing and supported by substantial evidence contained in a written record. The City shall consider the following factors in reviewing applications for new telecommunications towers:

a. The height and setbacks of the proposed tower;

b. The proximity of the tower to residential structures and residential district boundaries;

c. The nature of uses on adjacent and nearby properties;

d. The surrounding topography;

e. The surrounding tree coverage and foliage;

f. The design of the tower, with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness;

g. The proposed ingress and egress;

h. The availability of suitable existing towers or other structures for antenna co-location; and,

i. The impact of the proposed tower upon scenic views and visual quality of the surrounding area.

Leer este código donde se publica (city website (downloaded by hand)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:suwanee/zoning/803@2026-11-14-e93bb31a90

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Suwanee Zoning Ordinance, SECTION 803. Tower Requirements | Georgia Commons