Sylvester · Ordenanza de zonificación
Appendix A - ZONING / Article XXII - SOLAR PANEL USAGE
Section 22.02. Solar energy system, ground mounted.
Sobre este texto
- As published by Municode, current through 2022-12-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A ground-mounted solar energy system shall be subject to the following regulations:
(a) Location.
Permitted Districts:
C-2, Commercial, Highway C-PUD, Commercial Planned United Development AG, Agriculture M, Manufacturing FH, Flood Hazard District Prohibited Districts:
R-1, Single Family Residential District R-2, One, Two and Multiple Family Residential District R-PUD, Residential Planned Unit Development R-OI, Restricted Office Institutional C-1, Commercial Central Business District
(b) Placement.
1. A ground-mounted solar energy system shall not be located within the front yard set-back area set forth on article XIX. In district where no front yard set-back is required, the ground-mounted solar energy system shall not be located within 30 feet of the road fronting the piece of property.
2. A ground-mounted system shall not be located over a septic system, leach field area or identified reserve area unless approved by the health department.
3. If located in a floodplain or an area of known localized flooding, all panels, electrical wiring, automatic transfer switches, inverters, etc. shall be located above the base flood elevation.
4. Panels and ground mounts shall be installed per manufacturer's specifications.
5. All ground-mounted solar energy systems shall be placed so that concentrated solar radiation or glare does not project onto nearby structures or roadways.
(c) Maximum area coverage. A solar energy system shall not exceed 50 percent of the footprint of the principal building served. For residential properties located in agricultural districts, a ground-mounted solar energy system shall not exceed 25 percent of the footprint of the principal building served.
(d) Height. The maximum height of a ground-mounted solar energy system shall not exceed the maximum building height for accessory buildings in the zoning district in which it is located, set forth in article XIX or 20 feet, whichever is less.
(e) Permitting. A building permit is required for any ground-mounted solar energy system and for the installation of any thermal solar energy system.
Historia
(Ord. No. 2015-07, § 2, 8-17-2015)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.