Tallapoosa · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 106 - ZONING / Article V - USE REQUIREMENTS BY DISTRICTS
Sec. 106-147. Planned communities.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Large scale (minimum of 25 acres), master planned development which may allow for residential development at higher density than is allowed in other developments, provided that greenspace, pedestrian trail and recreational areas are set aside and fully developed prior to a Certificate of Occupancy being issued for any structure.
(1) PUD—Planned unit development. Master planned residential district, usually a mix of rental/resident owned property. Must have open space/recreational land set aside and dedicated for such (development rights assigned to a land trust in perpetuity [such as the nature conservancy]), as well as being completely installed prior to, a certificate of occupancy being issued. Property density in section developed may be much higher than regularly permitted. Must receive permission from planning coordinator, planning commission and the mayor and council.
(2) PMURD—Planned mixed-use residential development. Master planned, primarily residential district, mixed use development, which also contains commercial/retail land uses. Must have open space/recreational land set aside and dedicated for such (development rights assigned to a land trust in perpetuity [such as the nature conservancy]), as well as being completely installed prior to, a certificate of occupancy being issued.
Property density in section developed may be higher than regularly permitted. Must receive permission from planning coordinator, planning commission and the mayor and council.
(3) PESS—Planned elementary school sub-division. Extremely large, minimum of 200 acres; master planned, residential sub-division based upon the construction of a single elementary school and the residential dwellings which are anticipated to, when the development is complete, provide all the students which shall attend this elementary school (it is intended that all students within this development shall be able to, and shall be anticipated to, walk to this school). All costs associated with the construction of this school shall be borne by the developers (and thus passed on to the home purchasers), and these plans must be approved by the Haralson County Board of Education.
Development density may be substantially higher than permitted in other districts.
Must have open space/recreational land set aside and dedicated for such, as well as being completely installed, as well as have the public school constructed (or a bond dedicated equal to the cost of the school construction plus 25%), prior to a certificate of occupancy being issued (such as the development rights being deeded to land trust/conservancy in perpetuity). If enacted at the time, various impact fees may be waived by the Mayor and council and/or Haralson County Board of Education (or whatever governmental unit adopted, instituted and collects such fees). Must receive permission from planning coordinator, planning commission, Haralson County Board of Education and the mayor and council.
(4) Approval process. The purpose of these large scale master planned communities is to provide greater efficiency/economy of scale through higher density residential development, permanently preserved conservation tracks and close proximity of retail stores, where appropriate; which hopefully will increase walk-ability and decrease the number of car trips generated daily on a per capita basis. In relation to PESS, it is intended to strive for a garden city environment similar to Radburn, N. J.; where the elementary school/civic area/green pasture are the prime focal points, and where housing is arranged around this focal point, and lastly, where pedestrian activity is separated from automotive movement, thus substantially increasing family safety. An application fee of $150.00, in addition to any fees for rezoning and other site plan review fees, is required.
a. A planned unit development shall be located in an area where public and private facilities and services are available, or will be made available by the time the development reaches the stage of any initial availability of occupancy and shall not be on less than 25 acres. The following shall be filed with the application for rezoning, in addition to any information otherwise required of all rezoning applications:
1. The proposed name of the PUD, PMURD or PESS.
2. An aerial photograph of the area and vicinity.
3. A complete and legal description of the proposed planned unit development, to include a legal plat.
4. A tabulation of total acreage of the site and the designation for various uses, such as parking, structures, streets, parks, playgrounds, schools, residential areas, commercial areas.
5. Building density of residential areas.
6. Preliminary site plan/subdivision plans. Must meet all subdivision regulations in relation to road and infrastructure requirements (sewer, storm, potable water design).
7. Proposed circulation of vehicle and pedestrian traffic.
8. Approval block for the Haralson County Board of Education, City of Tallapoosa Planning
Commission and the mayor and council of the City of Tallapoosa.
9. Statement of concurrence/awareness: All public facilities, including schools (if applicable) and recreation areas/conservation areas (conservation easement), sewer and water, streets, etc., shall be completed prior to a certificate of occupancy being issued for any residential structure.
10. Plans shall be submitted to the planning coordinator, city manager or his/her designee. They shall be reviewed for compliance and, if in the opinion of that official, are deemed to meet all standards, a public hearing with the planning commission shall be scheduled. If the planning commission provides it approval, the plans shall be presented to the mayor and Council of Tallapoosa (except PESS). Upon receiving approval from the mayor and council, the plans final plat shall be recorded and the rezoning affective for one year, if construction does not begin.
11. PESS. Prior to being submitted to the mayor and council, these plans must be approved by the Haralson County Board of Education, or its successor (including whatever approval is required from the State Board of Education).
b. Within all planned community districts, the following uses are strictly prohibited:
1. Junkyards.
2. Crematoriums.
3. Commercial chicken growing houses (chicken houses).
4. Using semi-truck trailers and former shipping containers for storage.
(Ord. No. 01252, Sec. 106-71, 12-12-2005; Ord. No. 01270, exh. 2008-K, 12-8-2008; Ord. No.
01269, exh. 2008-I (106-71, 12-8-2008; Ord. No. 01284, exh. 2016-B(106-71), 6-13-2016; Ord.
No. 01312, § 1(Exh. 2024-B), 3-11-2024)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.