Ir al contenido
Georgia Commons
Menú

Thomson · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 22 - COMPREHENSIVE ZONING ORDINANCE / Article IV - ADMINISTRATION / Division 1 - GENERALLY

Sec. 22-138. Application for building permit.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Application for a building permit shall be made in writing at city hall on forms provided for the purpose. It shall be unlawful for the city building inspector to approve the plans or issue a building permit for any excavation or construction until he has inspected such plans in detail and found them to be in conformity with this chapter. To this end, the city building inspector may require that every application for a building permit for excavation, construction, moving or alteration shall be accompanied by a plan or plat drawn to scale and showing the following in sufficient detail to enable the building inspector to ascertain whether the proposed excavation, construction, moving or alteration is in conformance with this chapter:

(1) The actual shape, location and dimensions of the lot to be built upon.

(2) The shape, height, use and location on the lot, buildings or structures to be erected or altered.

(3) The sizes, locations and use of all existing buildings or structures on the lot.

(4) The number of dwelling units the building, if residential, is designed to accommodate.

(5) The setback lines of buildings on adjoining lots.

(6) The layout of off-street parking and unloading spaces.

(7) Signature of the county health officer approving the proposed location of the septic tank and field lines provided public sewerage is not available.

(8) Such other information concerning the lot or adjoining lots as may be essential in determining whether the provisions of this chapter are being observed.

(b) If the proposed excavation, construction, moving or alteration as set forth in the application for a building permit is in conformity with the provisions of this chapter, the city building inspector shall issue a building permit for such excavation, construction, moving or alteration. If the application for a building permit is not approved, the city building inspector shall state in writing on the application the cause of such disapproval. Issuance of a permit shall in no case be construed as waiving any provision of this chapter, and building permits

shall be void after 12 months from date of issue unless substantial progress on the project has been made by that time.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 426, § 402.3, 6-26-86)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:thomson/zoning/22-138@2026-11-11-b6e4771a4a

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Thomson Zoning Ordinance, Sec. 22-138. Application for building permit | Georgia Commons