Troup County · Ordenanza de zonificación

Appendix B - LAND USE AND ZONING / Article XIII - TELECOMMUNICATIONS ANTENNAS AND TOWERS

Sec. 13.7. Application requirements.

Sobre este texto

  • As published by Municode, current through 2026-06-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Application for a special use permit to install a new telecommunication facility. In the case of a new tower, the applicant shall be required to submit a written report demonstrating its meaningful efforts to secure shared use of existing tower(s) or the use of alternative buildings or other structures within the county that are at or above the surrounding tree height or the tallest obstruction and are within one mile of the proposed tower. Copies of written requests and responses for shared use shall be provided to the county in the application, along with any letters of rejection stating the reason for rejection.

(1) Proof of need for the facility.

(a) A detailed narrative description and explanation of the specific objective(s) for the new facility, expressly including and explaining the purpose

and need for the facility, such as coverage and/or capacity needs or requirements, and the specific geographic area of intended coverage.

(b) Technical documentation that proves the need for the wireless telecommunications facility to provide service primarily and essentially

within the county. Such documentation shall include a propagation study of the proposed site and all

adjoining planned, proposed or existing sites, that demonstrates a significant gap in coverage and/or, if

a capacity issue is involved, to include an analysis of the current and projected usage (traffic studies) using generally accepted industry methods and standards, so as to conclusively prove the need for what is proposed. A desire to change, upgrade, or improve the technology of the service shall not be deemed a need in the context of this article.

(c) All the modeling information (i.e., data) input into the software used to produce propagation studies including, but not limited to, any assumptions made, such as ambient tree height.

(d) A copy of the FCC license applicable for the intended use of the wireless

telecommunications facility, as well as a copy of the five- and ten-year build-out plan required by and filed with the FCC.

(e) The frequency, modulation and class of service of radio or other transmitting equipment.

(f) The maximum transmission power capability of all radios, as designed, if the applicant is a cellular or functional equivalent carrier, or the maximum transmission power capability, as designed, of all transmission facilities if the applicant is not a cellular or functional equivalent carrier.

(g) The actual intended transmission power stated as the maximum effective radiated power (ERP) both in dBm's and watts.

(2) In the case of a new telecommunication facility, to inform the public, the applicant shall hold a "balloon test" prior to the initial public hearing on the application.

The applicant shall arrange to fly, or raise upon a temporary mast, a minimum of a ten-foot in length brightly colored balloon at the maximum height of the

proposed new tower.

(3) At least 14 days prior to the conduct of the balloon test, a sign shall be erected to be clearly visible from the road nearest to the proposed site and shall be removed no later than 14 days after the conduct of the balloon test. The sign shall be at

least four feet by eight feet in size and shall be readable from the road by a

person with 20/20 vision.

(4) Such sign shall be placed off, but as near to, the public right-of-way as is possible.

(5) Such sign shall contain the times and date(s) of the balloon test and the date, time and location of the required hearings, as well as a copy of the proposed site plan.

(6) The dates, (including a second date, in case of poor visibility or wind in excess of 15 miles per hour on the initial date)

times and location of this balloon test shall be advertised by the applicant seven and 14 days in advance of the first test date in a newspaper with a general

circulation in the county and as agreed to by the county. The applicant shall inform the county in writing of the dates and

times of the test, at least 14 days in advance. The balloon shall be flown for at least four consecutive hours between 10:00 a.m. and 2:00 p.m. on the dates chosen. The primary date shall be on a weekend, but the second date, in case of poor visibility on the initial date, may be on a weekday. A report with pictures

from various locations of the balloon shall be provided with the application.

(7) The applicant shall notify all property owners and residents located within 1,500 feet of the nearest property line of the subject property of the proposed construction of the tower and wireless facility and of the date(s) and time(s) of the balloon test. Such notice shall be provided at

least 14 days prior to the conduct of the balloon test and shall be delivered by

U.S. Certified Mail.

(8) The tower shall be structurally designed to accommodate at least five additional

antenna arrays equivalent to those of the applicant as regards the load and stress created on the tower and located as close to the applicant's antenna as possible

without causing interference. A claim of interference because of a need to have

greater than six feet of vertical clearance between facilities, measured from the

vertical centerline of one array to the vertical centerline of another, must be proven by technical data and not merely verbal or written assertions.

(9) Retention of expert assistance and reimbursement by applicant.

(a) The county may hire any consultant and/or expert necessary to assist the county in reviewing and evaluating the application, including the construction and modification of the

site, once permitted, and any site inspections. To the extent this article requires the applicant to provide documentation prepared by a trained certified professional licensed to practice in Georgia (professional engineer, architect, radio frequency engineer), the review of such documentation shall be carried out by a similarly qualified professional.

(b) To prevent the taxpayers from having to pay for the expert technical

assistance needed by the county that is necessitated by the application, an applicant shall be required to place with the county an escrow

deposit of no less than $5,000.00, the case of a new facility.

(c) The placement of the initial deposit with the county shall precede the

pre-application meeting or any work being done as regards processing an application. The county will maintain a separate escrow account for all such funds. The county's consultants/experts shall invoice the county for its services in reviewing the application, including the construction and modification of the site, once permitted. The initial deposit shall not be increased without action by the application review committee finding that the initial application request has been modified, that the scope of the review is unique, or the applicant has failed to cooperate with the review causing additional staff/consultant time and effort to complete the evaluation of the application. However, if at any time during the process this

escrow account has a balance less than $1,000.00, and the application review committee finds that the increase is warranted, the applicant shall immediately, upon notification by the county, replenish said escrow account so that it has a balance of at least $5,000.00 in the case of a new facility application. The applicant may appeal the decision of the application review committee to require the replenishment of an escrow account to the board of commissioners by providing notice to the community development director within five days of notification of the decision of the application review

committee and the decision of the board of commissioners shall be final.

Such additional escrow funds shall be deposited with the county before any further action or consideration is taken on the application. In the event that the amount held in escrow is more than the amount of the actual invoice at the conclusion of the project, the remaining balance shall be promptly refunded to the applicant upon written request.

a. No work shall be done on an application for which the full amount of the escrow deposit as set forth in the preceding subsection 10 (b) of this section has not been placed with the county. In the event the

escrow deposit minimum balance as set forth in this subsection is not maintained, all work on the application shall cease

until the deposit is replenished as required.

(d) The total amount of the funds needed as set forth in subsection 10 (b) of

this section may vary with the scope and complexity of the project, the completeness of the application, necessary discussions with the applicant and other information as may be needed to complete the necessary review, analysis and inspection of any construction or modification.

(e) Records of all outside costs associated with the review and permitting process shall be maintained and available for public inspection,

in compliance with applicable

O.C.G.A § 50-18-71.

Application for a building permit for any wireless facility shall be made by the person, company or organization that will own and operates the telecommunications facility. An application will not be considered until it is complete, and the following information shall be submitted when applying for said permit and must be submitted for an application to be considered complete:

(1) Basis information. A report from a qualified, registered professional engineer licensed in the State of Georgia, documenting the following:

(a) Wireless facility height and design, including technical, engineering,

economic and other pertinent factors governing selection of the proposed design;

(b) Total anticipated capacity of the telecommunications facility, including number and types of antennas which can be accommodated by the

facilities;

(c) Evidence of structural integrity of the tower structure; and

(d) Structural failure characteristics of the telecommunications facility and

demonstration that site setbacks are of adequate dimension (to contain debris).

(2) A definition of the area of service to be served by the antenna or tower and

whether such antenna or tower is needed for coverage or capacity.

(3) The identity of a community liaison officer appointed by the applicant to resolve

issues of concern to neighbors and residents relating to the construction and operation of the facility. Included within such designation shall be name, address, telephone number, facsimile number and electronic mail address, if applicable.

(4) Site plan. An applicant for a telecommunications facility building permit must present a site plan that discloses the

following:

(a) Location of guy wires;

(b) Location to nearest residential structure;

(c) Height elevations above ground level;

(d) Height elevation above sea level;

(e) Relation to slope set forth in the airport special zoning district; and

(f) Full description of landscaping and fence material to be used.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2025-03, 6-3-2025; Ord. No. 2026-04, § IV, 4-21-2026)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:troup-county/zoning/13.7@2026-06-16-f71efa0905