Ir al contenido
Georgia Commons
Menú

Troup County · Ordenanza de zonificación

Appendix B - LAND USE AND ZONING / Article IX - OFF-STREET LOADING STANDARDS

Sec. 9.1. Provision of off-street loading.

Sobre este texto

  • As published by Municode, current through 2026-06-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(1) This section shall apply to all activities related to loading and unloading.

(a) Loading activities within 150 feet of zoning districts that allow residential uses shall only be permitted Monday through Friday

from 7:00 a.m. to 10:00 p.m. and on Saturdays from 9:00 a.m. to 9:00 p.m.

(b) In no case shall loading activities hinder or obstruct the free movement of vehicles, cyclists, and pedestrians over a road,

street, sidewalk, alley, or interrupt parking lot circulation.

(c) All off-street loading activities and access shall be provided with an asphalt or

concrete surface.

(d) Loading structures and bays associated with loading areas shall be either screened or placed upon a site in a manner that

prohibits visibility of such areas from a public right-of-way.

(e) Loading spaces.

(i) When required, one (1) or more off-street loading space shall be provided on the

same or adjoining premises with the facility it serves, either inside or outside a building or structure.

(ii) A loading space shall have minimum dimensions of 12 feet wide and 35 feet deep.

(iii) The loading space shall maintain overhead clearance of 14 feet.

(iv) All off-street loading spaces shall have access from an alley, or if there is no

alley, from a road or street.

(f) Minimum loading space requirements for non-residential uses:

Loading Table Gross Floor Area Required Loading Spaces 0—49,000 square feet 1 49,000—100,000 square feet 2 100,000—160,000 square feet 3 160,000—240,000 square feet 4 240,000—320,000 square feet 5 320,000—400,000 square feet 6 Each 90,000 above 400,000 square feet 1

(2) Within the commercial and industrial corridor areas:

(a) No loading or unloading of material shall take place in any front or side yard of any parcel that fronts on the highway rightof-way.

(b) Buildings will be designed to provide service entrances and loading areas at

the rear.

(c) Should the building orientation angle to the primary road or street allow the

loading area to be visible from the primary road or street, then the loading and

unloading area shall be screened from the primary road or street.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2025-03, 6-3-2025)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:troup-county/zoning/9.1@2026-06-16-7bb3b57d8a

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Troup County Zoning Ordinance, Sec. 9.1. Provision of off-street loading | Georgia Commons