Sec. 2.4. Drawings and specifications.
Sobre este texto
- As published by Municode, current through 2026-06-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(1) Requirements. When required by the Community Development Director, two (2) or more copies of specifications and of drawings, drawn
to scale with sufficient clarity and detail to indicate the nature and character of the work, shall accompany the application for a permit.
Such drawings and specifications shall contain information, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with the construction codes. Such information shall be specific, and the construction codes shall not be cited as a whole or in part, nor shall the term "legal" or its equivalent be used, as a substitute for specific information. All information, drawings, specifications and accompanying data shall bear the name and signature of the person responsible for
the design.
(2) Additional data. The Community Development Director may require details, computations, stress diagrams, and other data necessary to describe the construction or installation and
the basis of calculations. All drawings, specifications and accompanying data required by the Community Development Director to be prepared
by an architect or engineer shall be affixed with their official seal.
(3) Design professional. The design professional shall be an architect or engineer legally registered under the laws of this state regulating
the practice of architecture or engineering and shall affix his official seal to such drawings, specifications, and accompanying data, for the following:
(a) All group A, E, and I occupancies.
(b) Buildings and structures three (3) stories or more high.
(c) Buildings and structures 5000 square feet (465 m 2 ) or more in area.
For all other buildings and structures, the submittal shall bear the certification of the applicant that some specific state law exception permits its preparation by a person not so registered.
(4) Exception. Single-family dwellings, regardless of size, shall require neither a registered architect nor engineer, nor a certification that an
architect or engineer is not required.
(5) Structural and fire resistance integrity.
Plans for all buildings shall indicate how required structural and fire resistance integrity will be maintained where a penetration of a required fire resistance wall, floor or partition will be made for electrical, gas, mechanical, plumbing, signal and communication conduits, pipes and systems and also indicate in sufficient detail how the fire integrity will be maintained where required fire resistance floors intersect the exterior walls.
(6) Foundation survey requirement.
(a) Applicability. A foundation survey shall be required for any building site, subdivided lot, or rural tract, including, but not limited to, new construction, additions, or the placement of accessory structures, when the proposed structure is located within 150 percent of the applicable minimum required front, side, or rear yard setback, measured from the applicable property line, or when such survey is deemed necessary by the director of community development or the building official. All measurements shall
be made in accordance with section B.7.1 of the Unified Development Ordinance.
(b) Survey preparation and submission. The required foundation survey shall be prepared and certified by a surveyor licensed in the State of Georgia. The survey shall accurately depict the exact location of the foundation in relation to all applicable property lines. A copy of the completed survey shall be submitted to the community development office, and the original or a duplicate shall be maintained onsite for the duration of construction.
(c) Encroachment and compliance. If the foundation survey indicates an encroachment into any required front, side, or rear yard setback established by Troup
County Building and Zoning regulations, the applicant shall implement corrective measures necessary to achieve full compliance. No vertical construction shall commence, nor continue, until all encroachments have been remedied to
the satisfaction of the Troup County Building and Zoning Department.
(d) Manufactured housing. A foundation survey shall be required for all manufactured homes placed within 150 percent of the applicable minimum required front, side, or rear yard setback, measured from the applicable property line, or when such survey is deemed necessary by the director of community development or the building official. All measurements shall be made in accordance with section B.7.1 of the Unified Development Ordinance.
(7) Hazardous occupancies. The Community Development Director may require the following:
(a) General site plan. A general site plan drawn at a legible scale which shall include, but not be limited to, the location of all buildings, exterior storage facilities, permanent accessways, evacuation routes, parking lots, internal roads, chemical loading areas, equipment cleaning areas, storm and sanitary sewer accesses, emergency equipment and
adjacent property uses. The exterior storage areas shall be identified with the hazard classes and the maximum quantities per hazard class of hazardous materials stored.
(b) Building floor plan. A building floor plan drawn to a legible scale, which shall include, but not be limited to, all hazardous materials storage facilities within the building and shall indicate rooms,
doorways, corridors, exits, fire rated assemblies with their hourly rating, location of liquid tight rooms, and evacuation routes. Each hazardous materials storage facility shall be identified on the plan with the hazard classes and quantity
range per hazard class or the hazardous materials stored.
Historia
(Ord. No. 2025-03, 6-3-2025; Ord. No. 2026-03, § II, 1-7-2026)
Reuniones que se refieren a esta sección
- Troup County Board of Commissioners, 20 de enero de 2026 (Actas)Nombra una ordenanza de la historia de esta sección en las actas: “ordinance # 2026-03”
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.