Tucker · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 46 / Article III - SPECIAL AND OVERLAY DISTRICT REGULATIONS / Division 5 - LAWRENCEVILLE HIGHWAY ZONING DISTRICTS
Sec. 46-1093. Redevelopment thresholds.
Sobre este texto
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Applicability.
(1) Renovations, alterations, adaptations, additions, restorations, repairs, or other redevelopment of a structure, or portions of a structure or site, that was in existence prior to the adoption of this zoning ordinance, shall be subject to the requirements of this section.
(2) Redevelopment projects require compliance with standards for new construction in the zoning ordinance when the value of the proposed improvements exceeds the thresholds in Table 3.20.
(3) Notwithstanding the above applicability, the added cost to construct the improvements shall not exceed 125 percent of the fair market value of the structure immediately prior to such redevelopment, or $20,000.00, whichever is greater. In such cases, the provisions requiring completion shall be applied in the order listed in the table below until the 125 percent cap is met.
(b) Exemptions.
(1) This section shall not apply to single-family attached or detached uses or projects developed in accordance with the standards in section 46-1092.
(c) Method of calculating thresholds.
(1) Fair market value shall be determined by the DeKalb County Tax Assessor.
(2) The phrase "construction costs" in this section shall encompass all costs, including phased project costs, for a cumulative period of 36 months after the date of the initial redevelopment application.
(3) Construction costs shall be calculated based on uses listed in the ICC Building Valuation Data Construction Cost Table (latest published edition).
Table 3.20: Redevelopment Thresholds Applicable Standardz Construction costs as a percentage of the fair market value of the structure 40%-60% 61%-80% 80% or more Dumpster Screening - Sec. 46-1091(i) % % % Fence Materials and Height - Sec. 46-1090(d) § 46-1093 Table 3.20: Redevelopment Thresholds Construction costs as a percentage of the fair market value of the structure Applicable Standardz 40%-60% 61%-80% 50% or more Dumpster Screening - Sec. 46-1091 (i) e ° ° Streetscape Standards - Sec. 46-1095 ° e e Fenestration Requirements - Sec. 46-1091(d) |- e ° Off-Street surface parking requirements - e e (design and landscaping) - Sec. 46-1096 Compliance with Chapter 34: Signs e e e Remainder of standards in Chapter 46 - - e (Ord. No. 02023-08-13, Exh. A, 9-IT-2023)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.