Ir al contenido
Georgia Commons
Menú

Turin · Ordenanza de zonificación

Article 8 - QUALITY CONTROL OVERLAY DISTRICT

8.10. Plan Review Procedures.

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-11

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Application Procedures. All applicants for new development, redevelopment or refurbishment of site or building where such renovation exceeds 50% of the assessed value, and/or construction permits that expand the use or building footprint shall apply for plan approval through the Town Clerk. Application forms available from the Town must be submitted, together with a scaled site plan depicting the proposed improvements.

Applications shall be filed with the Town Clerk 30 days prior to the meeting of the Planning Commission at which the application is to be considered. No construction or site work of any kind shall be permitted prior to approval of plans and specifications by the Council.

B. Pre-application conference. Prior to filing an application for rezoning, development permits or building permits of property within the Overlay, the applicant shall confer with the Town Clerk for the purpose of reviewing the proposal and to obtain information about development standards and ordinances affecting property within the Overlay.

C. Site Plan Requirement. Any application for rezoning, development permits or building permits of property within the Overlay shall be accompanied by a site plan as provided below. A narrative containing the following information shall also be provided:

• A description of the character of the development, including a summary of floor area by use, number and types of commercial spaces, total lot area and square footage allocation for parking, landscaping and greenspace.

• A development and construction schedule indicating major milestones in the proposed development.

• Projects to be developed in phases shall provide a general statement of the proposed development schedule by phase.

• Any agreements, provisions and covenants that govern the use, maintenance and protection of the development and any common or greenspace areas.

• A professional traffic study may be required for projects expected to generate more than 500 vehicle trips per day.

A “Design Book” that will depict and guide architectural style, scale and materials to be used in the development shall also be produced by the applicant. The front, rear and side elevations and perspective drawings of all structures to be built must be included in the Design Book.

D. Application Requirements. Applications for development under this Article shall be accompanied by a scaled site plan of not greater than one inch equals 50 feet depicting: (1) lot size and dimensions; (2) proposed project, including use, building footprint, height, materials and front, rear and side building elevations; (3) pedestrian circulation; (4) vehicular access and parking facilities; loading facilities; (5) buffers, greenspace and landscaping; (6) site lighting; (7) furnishings; (8) proposed signs; (9) dumpsters; and (10) adjoining uses and zoning. Information concerning the latter shall indicate the architectural relationship of the proposed project or improvement to the surrounding context and shall be in the form of sketches or photographs.

E. Review Procedures. The Planning Commission shall review all applications regulated under this Article. Such review shall ensure proposal consistency with the purposes of this Article and conformance to the standards contained herein. Site plan review by the Planning Commission shall precede any action by the Council. The findings and recommendations of the Planning Commission shall be provided to the Council, which may incorporate such findings and recommendations in their consideration of the proposal.

Planning Commission shall be empowered to issue non-binding approvals or denials of site development, construction or alteration matters. All applications require final action by the Council.

Applications proposing construction or site work that, in the opinion of the Planning Commission, do not comply with the standards of this Article shall be presented to the Council as nonconforming and the Planning Commission shall recommend denial.

Applications that may be approved by the Council shall be forwarded to the Town Clerk and the necessary permits issued. Should the applicant be unable or unwilling to comply with the recommended changes suggested to reach compliance with this Ordinance, no permits shall be issued. All recommended changes shall comply with the standards set out herein.

The findings of the Planning Commission shall comprise only non-binding recommendations to the Council, and the governing body shall be empowered to approve or deny the application based on those recommendations and application of this Article.

Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:turin/zoning/8.10@2026-11-11-f2e5427910

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Turin Zoning Ordinance, 8.10. Plan Review Procedures | Georgia Commons