Twiggs County · Ordenanza de zonificación
Chapter 9 - Special Requirements / 9.6 - Communication Towers
9.6.2. General Provisions.
Sobre este texto
- As posted on the county's website, retrieved 2026-11-23
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a) Communication towers shall be located, constructed, and buffered to ensure compatibility with surrounding land uses. To help ensure such compatibility each application for a proposed communication tower shall include the following information:
i. The exact location of the proposed tower, accessory buildings, landscaping, and other pertinent features shall be shown on an official zoning map. The maximum height, type and color or colors of the
proposed tower shall be provided. Such other additional information as may be required by the Zoning Enforcement Officer to fully review and evaluate the potential impact of a proposed tower shall be provided.
b) “Location of Communication Towers or Antennas.” Communication towers or antennas shall be allowed only in “R-AG, AG, G-I, and G-C Communication towers and antennas must be compatible land uses immediately adjacent to the tract of land on which the Communication Tower/Antenna is to be located.
c) “Additional uses permitted on site.” In any district where freestanding communication towers or antennas are allowed, such towers or antennas may not be located on a lot containing a residential structure.
d) “Additional users on existing communication towers.” Any additional users co-locating on existing communication towers shall require review and approval in accordance with these regulations.
e) “Measurement of tower height.” Measurement of tower height shall include antennas, base pad, and other appurtenances and shall be measured from the natural grade of the site.
f) “Time limit on project completion.” Once a communication tower or antenna is approved, a permit shall be obtained within one (1) year and the project shall be completed within one (1) year of approval by the Commission.
g) “Abandonment.” All obsolete or unused facilities shall be removed within one (1) year of cessation of operation at the site.
h) “Signs and advertising.” No signs or advertising shall be allowed on any tower or antenna, except for a warning sign relating to the public safety which is no greater than two (2) square feet in size and placed on the base of the tower at a height no greater than ten (10) feet above the ground.
i) “Security.” All communication facilities shall be equipped with an appropriate anticlimbing device or other similar protection device to prevent unauthorized access to the facility.
j) Any equipment shelter or cabinet that supports communication facilities shall be concealed from public view, integrated into the architecture of the structure, made compatible with the architecture of the surrounding structures, placed underground and/or screened or buffered. Landscaping may be required to conceal the structure from public view. Any equipment shelter or cabinet shall not be greater than three hundred and thirty (330) square feet nor higher than ten (10) feet. An aboveground equipment shelter or cabinet shall not be located in a front yard. If an equipment shelter or cabinet is placed underground, the air conditioning unit must be screened from public view and approval of such screening shall be subject to approval by the Board of Commissioners if the air conditioning unit is in the front yard.
k) Towers or antennas shall have either a galvanized finish or shall be painted a noncontrasting color.
l) Where lighting is required, dual lighting mode (red at night/strobe during the day) shall be allowed.
m) “Regulatory compliance.” All communication facilities must meet or exceed the current standards of the Federal Aviation Administration and Federal Communication Commission and any other agency of the State or Federal Government with authority to regulate these facilities. Proof of this compliance shall be submitted along with the application for the tower or prior to issuance of a zoning permit.
n) Setbacks
i. Communication tower or antenna setbacks shall be measured from the perimeter of the tower base to the property or baseline of the lot on which it is located;
ii. Communication tower or antenna structures must at a minimum be set back from the property or baseline a distance equal to the height of the tower; and
iii. No tower or antenna shall be located closer than the height of the tower to any residential structure or district plus one hundred (100) feet).
iv. Permit Procedures: All construction permits shall be issued based upon the approved Schedule of Fees and Charges by the Zoning Official. Permits issued for power construction shall be treated as separate permits from each tenant or user wishes to locate on a tower.
Leer este código donde se publica (county website (twiggscounty.us)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.