Sec. 5-156. Survey requirements.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(A) Foundation survey. Any person erecting, moving, enlarging, or reconstructing any principal or any accessory structure by 250 square feet or greater, which, under this ordinance, requires a building permit shall upon completion of the construction of the footings, concrete slab, piers, or other foundations, submit to the community development department a letter from the architect or the owner's agent certifying that the required setbacks have been met along with a survey prepared by a Georgia registered land surveyor showing the locations, boundaries, dimensions, elevations, and sizes of the following: the boundaries of the lot, all existing structures including foundations and their relationship to the lot(s) lines. The designated city official shall compare the location of all new or extended footing, concrete slabs, piers, or other foundations with the location of all proposed construction activity reported on the building permit application. No further inspections such as electrical, plumbing, or HVAC may occur after the foundation inspection unless the designated city official shall find that the foundation location is consistent with the permit as issued. A determination that the foundation location is consistent with the building permit as issued shall not be construed as a warranty or guarantee that the as-built drawing will be approved [see Section 5-156(B)], In all circumstances it is the responsibility of the owner, contractor or applicant to satisfy all setback requirements. A foundation survey is not required when an approved building plan shows all the setbacks to be double those required.
(B) As-built drawing requirements. On a project which site plan approval, special review, engineering, a drainage plan, or plan review is required, the owner, contractor or applicant shall file an as-built plan certified by a State of Georgia certified engineer, surveyor or architect demonstrating compliance with the previously approved plans and identifying any deviations therefrom. If there are deviations identified, the engineer or architect must certify that the deviations will not materially adversely alter the stormwater controls or drainage characteristics of the original plan or that the deviations are within acceptable levels of tolerance recognized by the profession. Until such certified as-built plans are accepted by the city and approved, no certificates of occupancy may be issued.
(C) Height certification. The city shall have the right to request that the contractor have a State of Georgia certified engineer or surveyor certify the height of any structure.
(Ord. No. 2000-23, 9-14-2000; Ord. No. 2000-23, add 10-4-2000; Ord. of 1-26-2006(3); Ord. No.
38-2011, 9-22-11)