Ir al contenido
Georgia Commons
Menú

Tybee Island · Ordenanza de zonificación

Appendix A - LAND DEVELOPMENT CODE / Article 7 - TREE REMOVAL REGULATIONS

Sec. 7-050. Tree removal requirements.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(A) Under the limits and conditions set forth below, trees may be removed from a lot or parcel provided that a minimum density of three trees per each 4,500 square feet of upland area is maintained. As used herein upland means the portion of the parcel that is landward of the GA DNR marsh delineation line.

(B) Except as provided in section 7-060 no significant tree shall be removed from any vacant lot, undeveloped parcel, or public right-of-way within the city.

(C) If the siting of a building footprint, the associated driveway, and parking areas require the removal of trees to a density less than that stated in subsection (A) of this section, the city manager or designated city representative may issue a permit to remove trees to a density below this standard under the following conditions:

1. The applicant must show that, within the applicable setback limitations, no locations for building footprints and driveway/parking exist that comply with the density requirement above.

2. Removal of trees shall be limited to either the fewest number or the least total DBH necessary for siting of the building and the least destructive configuration of driveway/parking.

3. Following construction, trees shall be replanted on the lot/parcel to establish the minimum density as stated in subsection (A) of this section. Such planting shall be in accordance with the standards set forth in section 7-090.

(D) No trees shall be removed from the DNR marsh setback line. Trees in the marsh setback may not be counted as "remaining trees" for mitigation purposes.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 12-2012, 4-26-2012; Ord. No. 2023-04, § 1, 2-23-2023)

Reuniones que se refieren a esta sección

Encontradas: 1. Son reuniones de este gobierno cuyas actas o transcripciones automáticas nombran esta sección, o una ordenanza de su línea de historia, de la más reciente a la más antigua. Halladas por regla a partir de las propias palabras de esos registros. Una referencia es un enlace a otro registro, no una afirmación de que la sección se aplica o se cambió.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:tybee-island/zoning/7-050@2026-11-11-6481dd2bf3

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Tybee Island Zoning Ordinance, Sec. 7-050. Tree removal requirements | Georgia Commons