Sec. 8-160. Permit procedures.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Application for a building permit shall be made to the Building and Zoning Department Tybee Island, Georgia on forms furnished by the community PRIOR to any development activities, and may include, but not be limited to the following: plans in duplicate drawn to scale showing the elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities.

Specifically, the following information is required:

(1) Application stage:

a. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;

b. Elevation in relation to mean sea level to which any non-residential structure will be flood-proofed;

c. Design certification from a registered professional engineer or architect that any proposed non-residential flood-proofed structure will meet the floodproofing criteria of subsections 8-190(2) and 8-210(2);

d. Design certification from a registered professional engineer or architect that any new construction or substantial improvement placed in a Coastal high hazard area will meet the criteria of subsection 8-230(5);

e. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development; and

(2) Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the Building and Zoning Department Tybee Island, Georgia an as-built certification of the regulatory floor elevation or flood-proofing level immediately after the lowest floor or flood proofing is completed. Where a structure is subject to the provisions applicable to coastal high hazards areas, after placement of the lowest horizontal structural members. Any regulatory floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When flood proofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same.

Any work undertaken prior to submission of these certifications shall be at the permit holder's risk.

The city building and zoning department shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 9-26-2008, Art. 3, § B)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:tybee-island/zoning/8-160@2026-11-11-de91fffb3d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Tybee Island Zoning Ordinance, Sec. 8-160. Permit procedures | Georgia Commons