Waleska · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 28 - ZONING / Article XIII - ADMINISTRATION
Sec. 28-394. Permit procedure.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Permit requirements.
(1) Development permit. A development permit shall be required for any proposed use of land, office or center in any commercial district providing shared parking, access, and service to three or more business establishments, or multifamily residential develop-ment before any improvements or grading of the land commences. Such development permits shall not be in lieu of building permits required for any structure within such developments.
(2) Building permit. A building permit shall be required for any proposed use of lands or building to indicate and ensure compliance with all provisions of this chapter before any construction or building commences.
(3) Manufactured home location permit. A manufactured home location permit is required for any person to commence the excavation for or construction of a manufactured home stand or the placement of manufactured home on an individual lot within a manufactured home park.
(4) Temporary certificates. The building official is authorized to issue a permit for temporary occupancy in addition to a permit for erection, alteration, moving, or repair of a structure provided the permit shall not exceed six months and shall include such conditions and safeguards as will protect the safety of the occupants and the public.
(b) Permit application.
(1) Development permit. An application for a development permit:
a. Shall be made to the zoning administrator; and
b. Shall be accompanied by complete plans in duplicate, signed by the author with his address, drawn to scale, showing:
1. The actual shape and dimensions of the lot to be built upon;
2. The exact sizes and locations on the lot of the buildings and accessory buildings then existing;
3. The lines within which the proposed building or structure shall be erected or altered;
4. The proposed building or structure which shall be erected or altered;
5. The existing or intended use of each building or part of a building;
6. The number of families or housekeeping units the building is designed to accommodate; and
7. Such other information with regard to the lot and neighboring lots as may be necessary to determine and provide for the enforcement of this chapter.
One copy of such plans shall be returned to the owner when such plans have been approved. Approval of a preliminary plat in accordance with all applicable provisions of the subdivision regulations and approval of site plans as required in article XVII:
amendment and zoning procedures, shall constitute approval of the development permit for such subdivision or development.
(2) Building permit. A building permit shall be required for any proposed use of lands or building to indicate and ensure compliance with all provisions of this chapter.
(3) Manufactured and mobile home location permit. Manufactured and mobile homes are subject to permitting requirements the same as building permits.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.