Sec. 22-334. Solar energy system special use permit.

Sobre este texto

  • As published by Municode, current through 2026-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Any SES shall meet the following requirements in order for a SES Special Use Permit to be issued:

(1) A solar energy system (SES) shall be constructed in either a C-1 (commercial) or I (industrial) zone.

(2) A SES must be set back from the property line the required distance for each zone, as specified in section 22-181. A SES shall be encircled by a security fence or wall a minimum of 6 feet tall. Screening vegetation shall be provided outside the security fence.

(3) A SES connected to the utility grid shall provide a "proof of concept letter" from the local utility company acknowledging the SES will be interconnected to the utility grid in order to sell electricity to the utility entity.

(4) A ground mounting plan and process must be submitted with the permit application to the County. The ground mounting plan may consist of standard solar manufacturer installation plans and processes for ground mounting.

(5) Signage. The names of the manufacturers, installers, facility owners, and facility operators, and their addresses and phone numbers shall be posted on the required fencing at each entrance of a SES. In addition, signage shall include a 24-hour emergency contact phone number and state the risks that may result from contact with a SES. No advertising, illuminated or other signage, shall be allowed around the solar energy system, with the exception of educational material.

(6) Glare and lighting. In order to prevent a glare that may constitute a nuisance to neighboring properties, all panels shall be constructed of non-reflective materials or shall be treated with an anti-reflective material.

If lighting is required, it shall:

a. Be limited to the minimum reasonably necessary for safe operation;

b. Be directed downward where reasonably feasible;

c. Incorporate full cut-off fixtures; and

d. Reasonably utilize motion sensors.

(7) The operation of the SES shall comply with the following:

a. Solar panels shall not be placed in the vicinity of any airport in a manner that would interfere with airport flight patterns. Acknowledgement from the Federal Aviation Administration may be necessary.

b. All power transmission lines from a ground mounted solar energy system shall be located underground after connection from the solar panel combiners to the interconnection point.

c. Clearing of natural vegetation shall be limited to that which is necessary for the construction, operation, and maintenance of the ground mounted solar energy system and shall comply with the requirements of the County Zoning Code. Any disturbed land shall be stabilized by a permanent seeding of perennial vegetation, such as grass or other dense surface cover, that will protect the soil surface from eroding.

d. The applicant shall demonstrate that the proposal will not have an adverse effect on neighboring properties or endangered wildlife species.

(8) A written emergency response plan is required for any SES. The plan shall be approved by the County's Planning Department, Fire Department, and Emergency Management Agency prior to start of operations. Each SES owner or operator shall update its emergency response plan no later than the first Monday in January of each year with a copy provided to all departments and agencies named in this subsection. The emergency response plan shall include the following:

a. The phone number, email address, and street address for all manufacturers, installers, owners, and operators.

b. The phone number, email address, and mailing address for a representative of the SES responsible for responding to public inquiries.

c. The material safety data sheets that apply to any materials on the SES.

d. Clearly marked means and instructions for authorized staff to shut down the SES.

e. A representative for the owner or operator should have a reasonable response to the location in the event of an emergency.

(9) In addition to a special use permit, an applicant wanting to construct a SES shall also apply for and meet all of the requirements for a building/development permit.

(10) Decommissioning. Unless otherwise approved, decommissioning shall begin no later than 12 months after a SES has ceased to generate electricity:

a. The SES and all structures associated with it shall be removed and recycled or otherwise reused to the extent reasonably practicable, at the owner(s) or operators expense.

b. The SES site shall be restored to as natural condition as possible within 6 months of the removal.

c. All disturbed land shall be stabilized by a permanent seeding of perennial vegetation such as grass or other dense surface cover that will protect the soil surface from erosion, prevent sediment and runoff at the site.

d. Before any project breaks ground, there must be a solar decommission plan in place for the future.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. O-01-24, § 15, 11-14-2024; Ord. No. O-01b-24, § 15, 12-19-2024)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:walker-county/zoning/22-334@2026-07-09-be8b7aa547

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Walker County Zoning Ordinance, Sec. 22-334. Solar energy system special use permit | Georgia Commons