Walthourville · Ordenanza de zonificación
Appendix A - ZONING / Article XII - TELECOMMUNICATIONS TOWERS AND ANTENNAS / 12.7 - Conditional use permit required.
12.7.1. General.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) If the proposed location, height, setback or other aspect of a proposed telecommunications facility cannot comply with the minimum requirements established in this article or are otherwise ineligible for administrative approval pursuant to section 12.6, then a conditional use permit shall be required for the construction of a tower or the placement of an antenna in any zoning district. All such uses shall comply with requirements set forth in this article and all other applicable codes and ordinances, unless the applicant can show that the denial of a permit in such a location will cause a significantly harmful and permanent degradation of service which cannot be overcome by any other means including planned or potential locations which would provide the same or similar coverage or capacity.
(b) In granting a conditional use permit, the governing authority may impose additional conditions to the extent that it concludes such conditions are necessary to minimize adverse effects from the proposed tower on adjoining or nearby properties as set out in subsection 12.7.5.
12.7.2 Application; contents; fee. All applications for conditional use permits shall be submitted to the administrator who shall forward the same to the governing authority for its consideration. Each application shall contain as a part thereof detailed plans and specifications as set forth in section 12.5. An application for a conditional use permit shall not be accepted for processing without the information required in section
12.5. An application fee shall be charged by the administrator in the amount stated in section 12.10.
12.7.3 Co-location of antennas required. Applicants for the erection of a tower or antenna, except amateur radio operators, shall be required to co-locate upon an existing tower structure. An exception to co-location shall only be made if the applicant adequately demonstrates that an existing tower suitable for co-location does not exist in the geographic antenna placement area, and that no suitable alternative tower structure is available as set forth in subsection 12.4.3 contained herein.
12.7.4 Public hearing. Before taking action upon the proposed conditional use permit, the governing authority shall hold a public hearing on the matter. At least fifteen (15) days prior to the date of the public hearing, the governing authority shall cause the following notice requirements to be instituted by the administrator:
(a) A sign shall be erected, in a conspicuous location, on or adjacent to the property under consideration. The sign shall state the time, place, location, and purpose of the public hearing.
(b) A letter shall be sent by certified mail, return receipt requested, to all property owners of record of abutting parcels, and to all property owners of residentially-used parcels lying in whole or in part within a distance of two (2) times the height of the proposed tower as measured from its base (as such property owners may be reasonably ascertained by the administrator), giving notice of the public hearing. The letter shall state the same information as required for the sign.
(c) A public notice shall be published in the newspaper in which the sheriff's advertisements appear once a week for two (2) consecutive weeks prior to the date of the hearing.
(d) Subsections (b) and (c) above shall be the responsibility of, and at the expense of, the applicant.
12.7.5 Considerations in approval or denial of conditional use permits. Any denial of a request to place, construct or modify a telecommunications facility shall be in writing and supported by substantial evidence contained in a written record. The following factors may be taken into consideration in acting upon a conditional use permit application under the provisions of this article:
(a) The height and setbacks of the proposed tower, antenna, and equipment and structures in support thereof;
(b) The proximity of the tower, antenna, and equipment and structures in support thereof to residential structures and residential district boundaries;
(c) The nature of uses on adjacent and nearby properties;
(d) The surrounding topography;
(e) The surrounding tree coverage and foliage;
(f) The design of the tower, antenna, and equipment and structures in support thereof, with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness;
(g) The proposed ingress and egress;
(h) The availability of suitable existing towers or other structures for antenna co-location;
(i) The impact of the proposed tower, antenna, and equipment and structures in support thereof upon scenic views and visual quality of the surrounding area;
(j) The needs of the applicant as balanced against the detrimental effects on surrounding properties;
(k) The impact of the proposed tower or antenna(s) on adjacent and nearby properties; and
(l) Such other considerations as may be implicated by the provisions of this article.
12.7.6 Requirements for issuance of conditional use permit. The conditional use permit may be issued by the governing authority only upon satisfaction of the following requirements:
(a) A proper application filed in accordance with the requirements of section 12.5;
(b) The application is otherwise in compliance with the conditions for the proposed conditional use required by this section;
(c) The applicant complies with the conditions imposed by the governing authority for the purpose of reducing the harmful effects of the use on surrounding uses and ensuring compatibility with surrounding uses;
(d) The governing authority determines that the benefits and need for the proposed conditional use are greater than any possible depreciating effects or damages to neighboring or nearby properties; and
(e) All fees and other expenses required have been paid in full.
12.7.7 Independent expert review. The administrator or governing authority may engage a licensed professional engineer or other qualified industry professional as an independent expert to review any of the materials submitted by an applicant for a conditional use permit and render an opinion regarding any concerns about the proposal, including but not limited to, structural integrity and the feasibility of alternative sites or co-location; provided, however, that prior to seeking the review of an independent expert, the zoning administrator or governing authority shall convey its concerns to the applicant in writing and shall allow the applicant a reasonable opportunity to address those concerns. if the applicant is unable to address those concerns to the satisfaction of the administrator or governing authority, the applicant shall be allowed a reasonable amount of time, not to exceed thirty (30) days, following the receipt of the letter to such effect, in which to modify the application to alleviate the administrator's or governing authority's concerns or withdraw the application altogether. If the applicant fails to so modify or withdraw the application within the required time, the administrator or governing authority may proceed to engage a licensed professional engineer to conduct the independent expert review and the expert's reasonable fees, costs and expenses shall be paid by the applicant; provided that the administrator or governing authority shall give the applicant written notice of its intent to do so. The expert's opinion shall not necessarily be determinative, but shall be a significant factor to be considered in granting or denying the application. No permit shall issue until the applicant has paid all such fees, costs and expenses incurred under this section.
12.7.8 Resubmittal of conditional use application. An application for a conditional use permit which has been denied shall not be resubmitted for a period of six (6) months and then only if the applicant can document a substantial change in need for a tower or antenna at the same location.
(Ord. No. 2000-002, § I, 10-3-2000) Sec, 12.8. Towers and antennas in residential and environmentally fragile areas.
12.8.1 Placement of towers and antenna in residential areas. Notwithstanding any other provision of this article, no tower (to also include the use of an alternative tower structure) shall be permitted in zoning districts R-1 through R-4 or within two thousand (2,000) feet of (1) the boundary line of any property zoned R-1 through R-4, or (2) any single-family residential dwelling located upon property not zoned R-1 through R-4, unless the applicant can show that the denial of a permit in such a location will cause a significantly harmful and permanent degradation of service which cannot be overcome by any other means including, without limitation, planned or potential locations which would provide the same or similar coverage or capacity; provided, however, that a tower (or use of an alternative tower structure) may, absent such showing, be permitted within two thousand (2,000) feet of any residential dwelling located on property not zoned R-1 through R-4 upon the written consent of the owner(s) of such residentially used property.
Applications for placement of a tower (or use of an alternative tower structure) within two thousand (2,000) feet of the external boundary line of any property zoned R-1 through R-4 shall be available only through the conditional use permit process.
12.8.2 Notwithstanding any other provision of this article, no tower or antenna shall be permitted in a zoning district classified Dunes and Marshland (DM-1).
Historia
(Ord. No. 2000-002, § I, 10-3-2000)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.