Warm Springs · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 38 - ZONING / Article XI - ADMINISTRATION AND ENFORCEMENT
Sec. 38-279. Building permits.
Sobre este texto
- As published by Municode, current through 2017-09-22
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Building permits shall be issued in accordance with the following provisions:
(1) Building permit required. It shall be unlawful to commence the excavation or filling of any lot for construction of any building, or to commence construction of any building, or to commence the moving or alteration of any building, or to commence the development of land for a use not requiring a building, until the building inspector or his designee has issued a building permit for such work.
(2) Issuance of building permit. In applying to the building inspector or his designee for a building permit, the applicant shall submit two copies of a dimensioned sketch or to-scale plan signed by the owner or his authorized agent, indicating the shape, size and location of the lot to be built upon, and the shape, size, heights, uses and location of the buildings to be erected, demolished, altered or moved, and of any buildings already on the lot, the number of dwelling units the building is designed to accommodate, if any, the setback lines of buildings or adjoining lots, and such other information concerning the lot or adjoining lots as may be essential for determining whether the provisions of this article and other ordinances of the city then in force are met. When all requirements have been met, the building inspector or his designee shall issue a building permit upon payment of any required fees, and shall retain one copy of the building permit and the sketch or plan.
(3) Refusal of building permit. If the sketch or plan submitted describes work which does not conform to the requirements of this article, the building inspector or his designee shall not issue a building permit, but shall return the sketch or plan to the applicant along with a signed refusal in writing. Such refusal shall state the reasons therefor, and shall cite the portions of this article with which the submitted sketch or plan does not comply. The building inspector or his designee shall retain one copy of the sketch or plan and of the refusal.
(4) Time limitations. Any building permit issued shall become invalid unless the work authorized by it shall have been commenced within six months of its date of issue, or if the work authorized by it is suspended or abandoned for a period of one year.
Historia
(Code 2002, § 34-242; Ord. of 2-10-2003, § 13.2)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.