Sec. 5.19. Site clearing and grading.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Grading and land disturbance operations shall not begin until approval of the preliminary plat or site plan (as applicable), subdivision construction plans and soil erosion and sediment control plans and until a pre-construction conference has been conducted with city and county officials, the developer, developer's consultant, contractors and subcontractors.
1. Initiation of clearing and grading activities.
a. Clearing and grading shall not proceed until issuance of an approved development permit authorizing such activities. No development permit authorizing clearing or grading shall be issued prior to review and approval by the city of construction plans as applicable to the property. See the procedures and permits article of these regulations for details.
b. Grading shall be done in accordance with the lines and grades drawn on the approved grading plan. Protective devices for undisturbed areas, if any are required, must be installed, inspected, and approved in accordance with the approved construction plans prior to the initiation of clearing and grading activities.
c. Erosion and sedimentation control measures. Required erosion and sedimentation control measures must be installed, inspected, and approved in accordance with the approved soil erosion and sedimentation control plan prior to any major development activity, and shall be maintained or supplemented as development progresses.
d. Stormwater drainage facilities. Required stormwater drainage facilities are to be installed in accordance with the approved stormwater management plan as development progresses.
2. Slopes.
a. Cut or fill slopes in the public right-of-way and/or slope easements shall not exceed three horizontal units to one vertical unit, unless otherwise approved by the city engineer based on topographic conditions. This is the maximum allowable slope and should not be considered the norm. If grading plans indicate cut or fill slopes outside of the right-of-way then the construction plans and final plat shall indicate slope easements for the required grading.
b. No cut or fill slopes or existing unadjusted slope shall encroach closer than eight feet from the curb back in curbed sections or 15 feet to the edge of pavement for uncurbed sections on any street right-of-way within the subdivision. A cut or fill slope between lots should be confined to the lower lot whenever possible so as to avoid erosion from the higher lot to the lower lot.
c. All fill slopes created for the purpose of street or home construction shall have a compaction of not less than 95 percent as determined by the established engineering practices.
d. All slopes created or existing within the subdivision or as a result of the subdivision development shall be planted or otherwise protected from erosion and failure.