Watkinsville · Ordenanza de zonificación
Appendix B - SIGN ORDINANCE § 13[12] / Article 5 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division I - PROJECT DESIGN
Sec. 5.4. Required improvements.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
1. Streets. The following shall be installed by the subdivider and dedicated to the city.
a. Storm sewer, drainage, curbs and gutter, ditches, related easements and appurtenances, as needed to provide proper drainage and grading of the streets.
Through (double frontage) Lots
b. Street paving.
c. Street name signs of the quality and design used and approved by the city engineer.
d. All traffic control signs, devices, and striping as specified by the city engineer.
2. Required improvements generally. The following improvements shall be provided by the developer per the requirements and standards in this article:
a. Survey monumentation.
b. Streets providing access to all lots, including the extension of streets required to provide access to adjoining properties.
c. Streets wholly within a subdivision shall be improved per this article. For existing streets that adjoin such a development, right-of-way shall be dedicated as a project improvement and as further necessary for deceleration and turn lanes, measured from the centerline of the street along the development's frontage.
d. Curb and gutter along all roadways.
e. Street name signs, striping and traffic control signs as approved by the city.
f. Street lights.
g. Driveway access to each lot.
h. Project access improvements (deceleration, turn lanes, etc.) as deemed necessary by the city engineer.
i. Sidewalks (including without limitation pedestrian and bicycle trails).
j. Stormwater drainage and detention facilities.
k. Public or private water supply.
l. Fire hydrants.
m. Public or private sanitary waste disposal and/or reuse water system.
n. Dedication of easements as required by these regulations.
3. Continuing maintenance period.
a. Continuing maintenance period established. The developer shall maintain and keep in good repair all improvements constructed by him from the date of completion and acceptance of the work by the city for two years.
b. Maintenance and performance surety. Prior to approval of a final subdivision plat or issuance of a certificate of occupancy, maintenance surety for all public improvements shall be provided by the developer, and performance surety shall be provided for all required improvements not yet completed.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.