Ir al contenido
Georgia Commons
Menú

Whitfield County · Ordenanza de zonificación

Appendix A - UNIFIED ZONING ORDINANCE / Article VII - TOWERS AND ANTENNAE

7-8. Shared use/co-location.

Sobre este texto

  • As published by Municode, current through 2026-05-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

New tower sites may not be permitted if there is technically and commercially reasonable space available for shared use/co-location on a conforming pre-existing tower.

7-8-1 The application for a permit to develop a tower shall demonstrate that no existing tower or alternative tower structure can accommodate the proposed antenna. Evidence submitted to demonstrate that no existing tower or alternative tower structure can accommodate the proposed antenna shall consist of the following:

(a) Certification that no existing tower or alternative tower structures are located within the geographic area necessary to meet the applicant's engineering requirements.

(b) Certification that existing tower or alternative tower structures have insufficient height and cannot be modified to accommodate the applicant's engineering requirements.

(c) Certification that existing tower or alternative tower structures do not have sufficient integrity or strength and cannot be modified to support the proposed antenna and related equipment.

(d) Certification that the proposed antenna would cause interference with the antenna on the existing tower or alternative tower structure, or that the antenna on the existing tower or alternative tower structure would cause interference with the applicant's proposed antenna.

(e) Certification that the fees, costs, or contractual provisions required by the owner in order to share an existing tower or alternative tower structure or to adapt an existing tower or alternative tower structure for sharing unreasonably exceed market costs.

(f) The applicant demonstrates that there are other objective limitations which render existing towers unsuitable.

7-8-2 Permit applicants for towers shall certify and demonstrate their intent to allow the shared use of such facilities with other tower apparatus which does not interfere with the primary purpose of the tower or such applicant shall document that the reserved space on the tower is to fulfill the owner's future needs. All applicants shall identify how the applicant will make available such shared use/co-location.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:whitfield-county/zoning/7-8@2026-05-11-08574bea9c

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Whitfield County Zoning Ordinance, 7-8. Shared use/co-location | Georgia Commons