Woodbine · Ordenanza de zonificación
Appendix A - ZONING / Article IX - AMENDMENTS
Sec. 9.2. Procedure for amendments.
Sobre este texto
- As published by Municode, current through 2026-04-10
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Requests to amend the Zoning Ordinance shall be processed in accordance with the following requirements:
A. Initiation Of Amendments. A proposed amendment to the Zoning Ordinance may be initiated by the Planning Commission, the City Council, or by application filed with the Zoning Administrator by the owner(s) of property.
B. Application For Amendments.
1. Application for amendment to the Ordinance, initiated by a party other than the City of Woodbine, shall be on a form approved by the City Council. Completed forms accompanied by a general layout plan and survey, if required, showing existing and proposed structures and uses, access drives, parking and loading areas, easements, utilities, signage, and any other supportive documentation required by the Planning Commission and/or City Council shall be filed with the Zoning Administrator at least thirty (30) days prior to the Planning Commission's scheduled meeting at which the application is to be heard. Any other communication purporting to be an application for amendment shall be regarded as mere notice of intention to seek an amendment.
2. Complete Application. An application is complete when all of the items required by these regulations and on the application form are prepared and/or answered, and any applicable fee has been submitted to the Zoning Administrator.
a. Incomplete applications will be returned to the applicant with a written description of the missing information, defects, or other problems. No further action will be taken to process an incomplete application.
b. Appeal of a determination of incompleteness may be made to the Planning Commission.
3. Fees. Application shall be accompanied by a fee as set forth in the Schedule of Fees. The Zoning Administrator shall issue a receipt for all fees received. Zoning fees shall be submitted to the City to cover the cost of advertising and other administrative expenses.
C. Site Development Plan. Applications to rezone property, special use permit or conditional use permit for, Medium—High Density Residential, Central Business, Roadside Business, Light Industrial, General Industrial, Interchange Commercial, Mobile Home Park, Planned Development, shall be accompanied by a site development plan, prepared by an engineer, architect or surveyor at a scale of not less than 1" = 90', containing the following elements:
a. Dimensions of the property involved in square feet or acres;
b. Locations and dimensions of existing and/or proposed structures with the type of usage;
c. Location of existing and proposed access drives with dimensions;
d. Location of existing and proposed setbacks with dimensions;
e. Location of existing and proposed easements with dimensions;
f. Location of existing and proposed rights-of-way with dimensions;
g. Marshland or wetland boundaries;
h. Proposed and existing water, sewer and drainage facilities;
i. Buffers;
j. Off-street parking and loading areas, including dimensions and identification of the total number of spaces required and the total number of spaces proposed;
k. Recreational areas with uses and dimensions;
l. Watercourses and lakes;
m. Proposed number of dwelling units and net acres available for building, in case of residential development; and
n. Loading areas, signage, off-street parking and outdoor lighting, in case of commercial;
industrial development; and
o. If Planned Development, a written zoning text in accordance with Section 5.11E;
p. Identification of existing and proposed zoning;
q. Name, address, phone number, cell phone number, and e-mail address of record of landowner and architect/surveyor/engineer/planner/contractor;
r. A final sequence of development schedule showing the order of construction and approximate completion date.
D. Hearing By The Woodbine Planning Commission. The Woodbine Planning Commission, at a regular or scheduled meeting, shall review and prepare a report, including its recommendation, for transmittal to the Woodbine City Council for its consideration. The Woodbine Planning Commission shall have the right to adopt rules and regulations providing for [the] manner in which it will conduct its business including how notice of its meetings will be given to the public.
Following action by the Woodbine Planning Commission, all papers and data pertinent to the application shall be transmitted to the City Council for final action.
E. Withdrawal. Upon withdrawal of an application after the Woodbine Planning Commission has taken formal action at a public hearing, an application shall not be initiated for an amendment affecting the same parcel or parcels of property, or any part thereof, by a property owner or owners for a period of six (6) months.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.