Woodbury · Ordenanza de zonificación
Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 1 - SUBDIVISION OF LAND / Article 1-6 - FINAL PLAT PROCEDURES
Sec. 1-603. Recording of final plat.
Sobre este texto
- As published by Municode, current through 2022-10-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Once the final subdivision plat has received approval as evidenced by the certificate of final plat approval, the applicant shall record the plat electronically with the Meriwether County Clerk of Superior Court.
(b) The applicant is responsible for paying any required recording fees.
(c) All plats must be in the Georgia Coordinate System West Zone NAD 83 before the plat is recorded. If the project is within 1,000 feet of a geodetic monument the plat must use the monument as a control/tie point. The applicant for final plat approval shall be responsible for forwarding an electronic copy of the final plat as recorded, along with recording information, to the zoning administrator. In addition, the subdivision applicant shall submit electronic (DWG/DXF and PDF) file copies of lot boundaries of subdivisions and related information as specified by the zoning administrator. Building permits may be withheld pending receipt of the electronic files and copy of the recorded final plat.
(d) Recordation of a final plat constitutes approval to begin the sale or transfer of subdivision lots.
Historia
(Ord. of 5-17-2021(1))
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.