Woodbury · Ordenanza de zonificación
Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 2 - ACCESS AND ROADS / Article 2-3 - ROAD SYSTEM REQUIREMENTS
Sec. 2-301. Planned streets.
Sobre este texto
- As published by Municode, current through 2022-10-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
When a future street or road, proposed in the comprehensive plan or comprehensive transportation plan, adjoins, or traverses a subdivision or development project, the future right-of-way shall be platted as part of the subdivision or development project. No development will be allowed within the platted future right-of-way except for drives and landscaping, and the platted future right-of-way is to be treated as a lot line for the provision of all setback
lines as required by the city zoning ordinance (codified as Appendix A of the Code of Ordinances).
Historia
(Ord. of 5-17-2021(1))
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.