Ir al contenido
Georgia Commons
Menú

Woodbury · Ordenanza de zonificación

Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 3 - UTILITIES AND DRAINAGE / Article 3-1 - UTILITIES

Sec. 3-110. Septic tank.

Sobre este texto

  • As published by Municode, current through 2022-10-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Where individual onsite wastewater disposal systems are proposed and allowed, individual lot sizes and widths must exhibit appropriate regard for the public health, drainage, and maintenance characteristics on the site. Additionally, detailed soil tests may be required in

order to verify the ability of the lots to safely contain and dispose of septic system effluent. All septic tanks and onsite wastewater disposal systems are subject to the approval of theMeriwether County Environmental Health - District 4 Public Health Department.

(b) Soil tests shall be required for each lot in a major subdivision prior to preliminary plat approval. The zoning administrator may waive the requirement to provide soil tests for any minor subdivision, provided that a note is placed on the plat requiring such soil test prior to issuance of a building permit.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 5-17-2021(1))

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:woodbury/zoning/3-110@2022-10-28-d2279cd1fb

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Woodbury Zoning Ordinance, Sec. 3-110. Septic tank | Georgia Commons